Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT ' <br /> 600 East Main Street, Stockton , California 95202-3029 <br /> Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www. sjgov. org/ehd/unitiii . html <br /> ABOVEGROUND PETROLEUM STORAGE ACT (APSA) PROGRAM INSPECTION REPORT <br /> CONTINUED <br /> Facility Facility Inspecti n 1 <br /> Name. (_ . u � ) Address: ? " q . <br /> Date: `- <br /> VIOLATIONS <br /> # C1 1 C2 FM Code Section HSC = CA Health and Safety Code; CFR = Code of Federal Re ulations <br /> C1 = Class 1 violation; C2 = Class 2 violation; M = Minor violation <br /> General Requirements for SPCC Plans (continued) <br /> 509 CFR 112.7(a) (3) (v) SPCC Plan failed to address disposal methods for recovered materials <br /> 510 CFR 112 .7(a) (3) (vi) SPCC Plan failed to include required contact list and phone numbers of the facility's response <br /> coordinator, cleanup contractors , and agencies to notify in case of discharge <br /> 511 CFR 112 . 7(a) (4) Failed to provide information and procedures to enable a person to adequately report discharges if a <br /> response plan was not submitted to the Regional Administrator RA <br /> 512 CFR 112.7(a) (5) Failed to organize emergency procedures for discharges in a readily useable way if a response plan <br /> was not submitted to the RA <br /> 513 CFR 112.7(b) SPCC Plan failed to include a description of potential equipment failure (direction , flow rate, quantity) , <br /> or provide equivalence as allowed by CFR 11 2.7a 2 <br /> 514 CFR 112. 7(c) Failed to provide secondary containment and/or diversionary structures that are capable of containing <br /> discharge from primary containment until it is cleaned u <br /> Failed to provide explanation , conduct periodic integrity testing of containers and/or periodic integrity <br /> 515 CFR 112.7(d) and leak testing for valves and piping if containment or discharge prevention structures were <br /> determined to be impracticable on an SPCC Plan or sections of one that is PE certified <br /> If a re�ponse plan was not submitted to the RA, and containment or discharge prevention structures <br /> 516 CFR 112 . 7 (d) w re(determi9 cd lo' be impracticable, the SPCC Plan failed to provide: ( 1 ) an oil spill contingency plan ; <br /> r (trl 'tment of manpower, equipment, materials to control and remove oil discharge <br /> 517 ' CFR 112 . 7 (e) Failed to conduct inspections and tests in accordance with written procedures and/or maintain signed <br /> records of inspections and tests as required by the facility's SPCC Plan on site for 3 years <br /> 518 CFR 112 . 7 (f) Failed to: ( 1 ) train personnel on discharge prevention ; (2) designate a person to be accountable for <br /> discharge prevention ; or 3 schedule prevention discharge prevention briefings at least annually <br /> Failed to describe how the oil handling , processing and storage areas are secured and controlled ; how <br /> 519 CFR 112 . 7 (g ) master flow and drain valves are secured; how unauthorized access to starter controls on oil pumps are <br /> prevented ; how out-of-service and loading/unloading connections are secured ; the appropriateness of <br /> security lighting ; or provide equivalence as allowed by CFR 112 , 7(a) (2) <br /> Failed to provide sufficient secondary containment capacity for tank car or tank truck loading and I <br /> 520 CFR 112 . 7 ( h) ( 1 ) unloading area if drainage area is not designed to flow into a catchment basin designed to handle I <br /> discharges <br /> 521 CFR 112 . 7 ( h ) (2) Failed to provide methods to prevent vehicles from departing loading and unloading areas before <br /> complete disconnection of transfer lines or provide equivalence as allowed bV CFR 112. 7(a) (2) <br /> Failed to inspect lower-most drains and all outlets of vehicles for discharge prior to filling and departure i <br /> 522 CFR 112 . 7 ( h) (3) and take appropriate measures to prevent liquid discharge while in transit or provide equivalence as <br /> allowed by CFR 112 .7(a) (2) <br /> Failed to evaluate field-constructed container for risk of discharge or failure due to brittle facture or <br /> 523 CFR 112 . 7 ( i) other catastrophe after repair, alteration , reconstruction , or change in service, or provide equivalence <br /> as allowed by CFR 112. 7(a) (2) <br /> SPCC Plan failed to include a complete discussion of conformance to discharge prevention and <br /> 524 CFR 112.7(j) containment procedures as listed in part 112 and any applicable more stringent State rules, regulations, II <br /> and guidelines <br /> If a response plan was not submitted to the RA, and secondary containment is not provided for qualified <br /> 525 CFR 112.7(k) (2) oil-filled equipment, the SPCC Plan failed to: (i) establish and document procedures for inspection or a <br /> monitoring program to detect equipment failure and/or discharge ; (ii) provide oil spill contingency plan <br /> and/or written commitment of manpower, equipment, materials to control and remove oil discharge <br /> SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 601 CFR 112 . 8(b) ( 1 ) Failed to prevent discharge into the drainage system from diked storage areas and/or inspect <br /> accumulation prior to drainage , or provide equivalence as allowed by CFR 112 .7(a) (2) <br /> 602 CFR 112 . 8(b) (2) Failed to use manual , open-and-closed design valves for the drainage of diked areas, or provide <br /> e uivalence as allowed by CFR 112.7 a 2 <br /> Failed to design facility drainage system from undiked areas to flow into appropriate ponds, lagoons, or <br /> 603 CFR 112 . 8 (b) (3) catchment basins (in areas not subject to flooding) designed to retain oil or return it to the facility, or <br /> rovide a uivalence as allowed by CFR 112.7(a) (2) <br /> Failed to equip the final discharge of all ditches with a diversion system that would retain oil in the <br /> 604 CFR 112. 8(b) (4) facility in the eventof . uncontro ed discharge if CFR112 . 8(b) (3) is not met, or provide equivalence as <br /> allowed b CFR 1 2 <br /> S Rece' a Tille: <br /> EHD 2 -02 Rev 9/1 /11 Page 2 PSA INSPECTI N REPOR <br />