Laserfiche WebLink
i <br /> Inspection Date: Q1iy / <br /> ANNUAL INSPECTION CHECKLIST <br /> Facility Inspector: sv% i 14-e �t04 d r_ Inspector Title: <br /> (printed) <br /> D Complete this checklist on an annual basis.The periodic AST inspection is intended for monitoring the external AST condition and its contaimment structure.This visual inspection does not require a <br /> Certified Inspector.It should be performed by personnel who are familiar with the Facility and can identify changes and developing problems. <br /> a (*)designates an item in a non-conformance status and indicates action is required to address the problem.Note the location,nature of the non-conformance item,and conective action in the <br /> description. <br /> a Retain completed checklists for at least 36 months. <br /> » In order to comply with EPA SPCC rules,a Facility must regularly test liquid level sensing devices to ensure proper operation(40 CFR 112.8(c)(8)(v)). <br /> a Note:If a change has occurred to the tank system or containment that may affect the SPCC Plan,the condition should be evaluated against the current plan requirement by a Professional <br /> Engineer knowledgeable in SPCC development. <br /> Location/Inspection Item Circle One I..Description <br /> STORAGE TANKS <br /> The following items are operational: <br /> Vents N* Vc V;1 <br /> Valves (anti-siphon, check, gate, fire) N* V4 vz t (� <br /> Liquid level equipment Y I <W /1 <br /> u �+a v ,: +.ice✓ ' ZJ ' c ,� <br /> Overfill equipment y * " C., <br /> Tank surfaces show signs of leakage Y* <br /> Tanks are damaged Y* <br /> Bolts, rivets, or seams are damaged Y* <br /> Tank supports are deteriorated or buckled Y* <br /> Tank foundations have eroded or settled Y* <br /> Level gauges or alarms are inoperative Y* <br /> V eats are obstructed Y* <br /> Secondary containment is damaged or stained Y* <br /> Water/product in containment area Y* N <br /> Containment drainage valve is open or is not locked Y* N <br /> PIPING <br /> Valve seals, gaskets, or other appurtenances are leaking Y* <br />