Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> a PROJECT INFORMATION <br /> l PROJECT NAME V19A4L4-� �k►iL PROJECT NUMBER 62-511 . be'-%4!S1_ WELL NO MW - 2- <br /> PROJECT <br /> PROJECT MANAGER , TYPE OF WELL V/ Monitonng Extraction Other <br /> RECORDED BY A Ir" SAMPLED BY AF DATE <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Well ggsing Diameter T <br /> �/ 2-inch flinch Other �Batler - Type F4 to <br /> ��feet below Top of Casing,TO Pump - Type <br /> Well Tata!Depth Other - Specify <br /> Depth to Water •13 feet below Top of Casing,WL Hydrocarbon Cd� <br /> Water Column Length .3?—feet <br /> Yes No <br /> Purge Volume Calculation (Water Column Length x Multiplier x No Volumes = Calculated Purge Volume) <br /> ) �:_'32— X . 1-7c, X _ 3 = 7. 8 Calculated Purge Volume = '7 _ gallons <br /> (WCL) (Multiplier) (No Jolumes) Actual Purge Volume = e!/ <br /> allons <br /> Multinher (Cayng Diameter Inches = GallonsAinear foot 2 W 0 17 4=0,66 6=15 8=26 <br /> Groundwater Parameter Measurement. Meter Typeys�Calibrated Yes_No <br /> TIME ELAPSED FLOwRATE DTW pH EC TEMP TURSIDnrY REDOX COMMENTS <br /> TIME (GPfup (ft) anhoslcm C (NTU) mV <br /> d <br /> roto /,S 1{ NPt a_ <br /> 023 3 3 d 5_1'i <br /> 16 -Zzo <br /> a . ( -50 <br /> I <br /> a <br /> I <br /> EN1?AONAIEN�A�GEOTFCNH SSOCI TESEI '� <br />