Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> 11--,, PROJECT INFORMATION <br /> PROJECT NAME W CAIScC. �_Y� PROJECT NUMBER Co5I� �b�4 WELL NO M <br /> PROJECT MANAGER TYPE OF WELL ___,/Monitoring Extraction Other <br /> RECORDED BY SAMPLED BY __jk4�_ DATE <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METRO❑ <br /> Well sing Diameter <br /> ` :� 2-inch 4Fnch Other Bailer - Type 1 <br /> Pump - Type <br /> Well Total Depth 7 3 g feet below Top of Casing,TO Other - Specify <br /> Depth to Water 44 i feet below Top of Casing,WL Hydrocarbon Oda <br /> Yes Na <br /> Water Column Length 12-7 bfeet <br /> Purge Volume Calculation (Water Column Length x Multiplier x No Volumes = Calculated Purge Volume) <br /> V2 -70 X Q, Ile, x — to i Calculated Purge Volume = • S^ allons <br /> (WCL) (Multiplier) 0 (No Volumes) Actual Purge Volume = allons <br /> Muktl Iter Casinq Diameter ct7 - Gailanafteasfoot Z=C f7 4=t2614 6=1 8= tx <br /> Groundwater Parameter Measurement Meter Type J O Calibrated ,Yes�No <br /> TIME ELAPSED FLOWRATE DTW pH EC TEME TURBIDITY REDOX COMMENTS <br /> TIME (GPM) (ft) onhowlcm d C NTU) mV f <br /> `w L <br /> tjZq <br /> '- 3 r <br /> 3• --� `gm <br /> I w = of "X �, <br /> - �7pNMFMAI.,QEOTECH/UGAL AHD MAT'6RfAL5 PROFF3�ORAL5 <br />