My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
15135
>
2900 - Site Mitigation Program
>
PR0518132
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:23:26 PM
Creation date
7/10/2019 11:39:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518132
PE
2960
FACILITY_ID
FA0013716
FACILITY_NAME
H & H MARINA
STREET_NUMBER
15135
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
06908021
CURRENT_STATUS
01
SITE_LOCATION
15135 EIGHT MILE RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. David Johnson - 2 - 13 July 2010 <br /> Herman and Helen's Marina f ' <br /> monitoring. Neither sampling plan, however, included a list of metals or a methodology for <br /> determining baseline concentrations of the metals. Central Valley Water Board staff discussed <br /> the omission and proposed a metals sampling plan in email correspondences to AGE on <br /> 6 and 7 July, respectively. AGE accepted the suggested sampling plan and stated that it <br /> would be incorporated into an addendum to the Revised Work Plan. <br /> The Revised Work Plan Addendum was submitted by email on 8 July. It provides for <br /> monitoring for bromide, bromate, trivalent and hexavalent chromium (Cr III and Cr VI), total <br /> chromium, and vanadium. Baseline concentrations for these parameters will be determined <br /> from a one-time, pre-injection sampling event. Depending on the pre-injection monitoring <br /> results, post-injection monitoring for the metals may exclude Cr VI and bromate and will be <br /> conducted on a monthly basis in select wells. <br /> Central Valley Water Board staff concurs with the Revised Work Plan and the Revised Work <br /> Plan Addendum. Please provide monthly reports of the pre- and post injection monitoring so <br /> that the need for implementation of the contingency plan can be evaluated. The Pilot Study <br /> Report is due by 3 January 2011. <br /> If you have any questions regarding this letter, you may contact me at (916) 464-4811 or at <br /> betaylor@waterboards.ca.gov. <br /> BRIAN E. TAY R, R.G. <br /> Engineering eologist <br /> cc: Ms. Adrienne Ellsaesser, San Joaquin Environmental Health Department, Stockton <br /> Mr. Gregory Torlai, Jr, Bustez Enterprises, Inc., Stockton <br /> Mr. Arthur Deicke, Advanced GeoEnvironmental, Inc., Stockton <br /> Mr. George V. Hartmann, Esq, Hartmann Law Firm, Stockton <br /> Ms. Pamela Neuvert, H&H Marina Properties, LLC, Stockton <br /> Ms. Nicole Gleason, Downey Brand Attorneys LLP, Sacramento <br />
The URL can be used to link to this page
Your browser does not support the video tag.