12 September 2003 <br /> AGE-NC Project No. 01-0865 <br /> Page 7 of 7 <br /> 4.7 PROPOSED SCHEDULE OF ACTIVITIES <br /> The work outlined in this work plan can be initiated upon receipt of approval by the CVRWQCB, <br /> AGE proposes the following estimated schedule for completion of the work: <br /> • Planning and Permitting: 4 to 6 months (for permitting if water is <br /> discharged directly into Delta Waterways.) <br /> • Trenching/ System installation: 2 - 3 weeks <br /> • Analytical Data 1 - 2 weeks <br /> • Report Preparation: 4 - 6 weeks <br /> 4.8. REPORT PREPARATION <br /> Quarterly reports will be prepared presenting the findings from pump and treat activities. The <br /> quarterly reports will include a description of work performed and the results of the influent and <br /> effluent ground water analysis. Conclusions and recommendations will also be included in the <br /> reports,if applicable.The report will be in a format acceptable to CRWQCB guidelines,and will be <br /> reviewed and signed by a California Registered Geologist. <br /> Advanced GcoRnvironmental,Inc. <br />