My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
15135
>
2900 - Site Mitigation Program
>
PR0518132
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 8:09:04 PM
Creation date
7/10/2019 11:40:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518132
PE
2960
FACILITY_ID
FA0013716
FACILITY_NAME
H & H MARINA
STREET_NUMBER
15135
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
06908021
CURRENT_STATUS
01
SITE_LOCATION
15135 EIGHT MILE RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Site Assessment Work Plan - Revised August 2003 <br /> HERMAN & HELEN'S MARINA <br /> 15135 Eight Mile Road, Stockton, California <br /> 1.0. INTRODUCTION <br /> At the request of Mr. Andrew Smith of Herman &Helen's Marina,Advanced GeoEnvironmental, <br /> Inc. (AGE) has prepared this revised work plan for 15135 Eight Mile Road, Stockton, California. <br /> The original AGE-prepared Additional Site Assessment Work Plan was prepared in response to the <br /> Central Valley Regional Water Quality Control Board's (CVRWQCB) directive, in a letter dated <br /> 21 April 2003,to continue the delineation of the lateral and vertical extent of hydrocarbon-impacted <br /> soil and groundwater and to determine the source of elevated concentrations of petroleum <br /> hydrocarbons in soil and groundwater near MW-6; this revised work plan includes concerns <br /> expressed by the C VRWQCB to the original work plan,in a letter dated 16 July 2003(Appendix A). <br /> The site and the surrounding area are illustrated in Figure 1. Structures and monitoring well and <br /> sampling locations are illustrated on Figure 2.This work plan provides a description of the scope of <br /> work and procedures for the advancement of soil probe borings st the site. <br /> 2.0. BACKGROUND <br /> Site background information is provided in Appendix B.Additional information can be found in the <br /> AGE-prepared documents Additional Soil and Ground Water Investigation Report dated 11 April <br /> 2003 and Quarterly Report-First Quarter 2003 dated 29 April 2003. <br /> 3.0. SCOPE OF WORK <br /> AGE proposes to advance four soil probe borings in the area of monitoring well MW-6 and the <br /> northern portion of the site to assess impacted soil and ground water. The assessment activities will <br /> consist of the following tasks: <br /> • Permitting and pre-field work preparations; <br /> • Probe boring advancement and sample collection; <br /> • Report preparation. <br /> Advanced GmEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.