Laserfiche WebLink
WORK PLAN-Monitor Well Installation <br /> ' Herman&Helen's Marina <br /> May 30,1997 <br /> Page-8- <br /> Method 8060 will not be performed for positive MTBE results. The analytical methods and analytical <br /> detection limits are presented below in Table 3.1. <br /> ' TABLE 3.1 <br /> Analytical Methods <br /> I CONSTITUENT METHOD DETECTION LIMIT <br /> Soil <br /> BTEX EPA 8020 5.0 lig/kg <br /> MTBE EPA 8020 10 Vg/kg <br /> ' TEPH 3550-LUFT .. 1.0 mg/kg (diesel, kerosene) <br /> 10.0 mg/kg (motor oil) <br /> TPH-G 5030-LUFT 1.0 mg/kg <br /> Groundwater <br /> BTEX EPA 602 0.3 gg/I (BTE) <br /> ' 0.6 µg/1 (X) <br /> MTBE EPA 602 1.0 µg/1 <br /> ' TEPH 3510-LUFT 0.05 mg/l (diesel, kerosene) <br /> 0.5 mg/I (motor oil) <br /> TPH-G 5030-LUFT 0.05 mg/l <br /> 3.8 Reporting <br /> ' A Monitor Well Installation Report will be prepared for submission to the PHS/EHD, Reclamation <br /> District #2029, and the CRWQCB. The report will include: (1) a site history, (2) a chronology of the <br /> ' fieldwork conducted at the site, (3) the laboratory results, (4) a scaled site plan, (5).drilling logs, (6) <br /> conclusions, and (7) recommendations. The monitor well installation is tentatively scheduled for July <br /> 1997, pending the PHS/EHD, Reclamation District#2029, and CRWQCB review and approval of this <br /> t work plan. If you have any questions or require additional information, please contact Donald Kresse <br /> at (209) 668-9234. <br /> ' Respectfully submitted, C>y11 GE04 C <br /> O <br /> i <br /> Qr i k,, <br /> JAMES F.WACK <br /> ' J es . Vyac (0'6611 Donald F. Kresse <br /> egistered Geologist Managing Geologist <br /> ' (CA #6647) Op CA Registered Geologist <br /> (CA #6430) <br /> H&H:H&H3.WP <br /> ' ;• CONDOR <br />