My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
833
>
2900 - Site Mitigation Program
>
PR0524607
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:26:03 AM
Creation date
7/11/2019 9:09:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0524607
PE
2950
FACILITY_ID
FA0016516
FACILITY_NAME
STOCKTON RAILYARD
STREET_NUMBER
833
Direction
E
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
833 E EIGHTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SED, 7. t,FH , \thit< < w <br /> s <br /> } I I - � , <br /> n, <br /> y v June 21 , 190 !, <br /> 2797-89-16 : i! <br /> Mr. Doug Wi son <br /> County of 5ati Joaquinf% <br /> llepartment ,of Ptibl i c Health S.r v i ces <br /> 1602 fast t a eltor Avenue <br /> Stockton, ck 95205 .� <br /> i, 1 , �N�A��yr�AL�N <br /> SUBJECT: NIOW PACIFIC'SD IN FGUf ( I') INCH DIESEL FUEL LINE ewl oN l S�Rq� CES <br /> LOWDear fir. Wilson, it <br /> i The intent of this letter' is lo inform you of the construction process of; <br /> the Eighth Street/Fresno Avenge Sanitary Sewer/Stut`m Drain Trunk Line <br /> Project, in, r~elation to Union Pacific's four (4") inch diesel fuel line.,. <br /> It was previously discussed that Union; Pacific Railroads four (4") inch <br /> diesel fuel line inay be tempo{ arily removed within the limits of the <br /> proposed pipeline construction. We are working with the contractor toward <br /> a plan that would maintain th integrity of the existing four" (4") inch <br /> line during construction thrc gh shoring and bracing. In the event a <br /> satisfactory" plan is not work d out, we want: to have a backup worm plan in <br /> { . <br /> place so construction carr con ince. The backup plan would require removal <br /> of the pipelzntr', as we provioasly disc'tssed, and our proposed work p'an- is <br /> described below. j <br /> Construction will begin atithe extr'eme west end of the project on�the <br /> week of June 18, 1990. lV is estimated that the project will last 120 <br /> days. It is also estimated that work will not reach the subject ;?', - <br /> intersection until 84 'day5 fr•cm startup. with Mork lasting appr'oxiinately <br /> 2-3 weeks. Jhe process fo� the temporary removal of the four-inch (4") � <br /> diesel ffiel 'line is as follows: <br /> r <br /> -A) Excavate and expose four-inch (4") diesel fuel line within -the <br /> lilts of temporary {removal <br /> D) Cut and cap each end at the locations stated earlier. <br /> C) €terhove existing section of pipe, keeping it intact such that is <br /> can be reinstalled 4t a later date. <br /> I� <br /> , r Dt Have a representative of San !Jooquin County Department of Health <br /> Services onsite to examine the underl ayi i3g soil once the pipeline <br /> J ;a, is ret oved. It is tnderstood that is there is no visual evidence <br /> ti Y ; of soil contaminate( n, either a vapor survey or soil borinc_r will <br /> not be' needed. f <br /> L <br /> E) $eginkrenching fog the installation of both the sanitary sewer <br /> w and storm drain .trunk lines'. " <br /> NOLTE and ASSOCIATES } <br /> . Engineers / Planners/Surveyors tF <br /> 12" North Syramrre Avenue, Suite 103, to. iteca, CA 953M TeL t209) 239-90bO { <br />
The URL can be used to link to this page
Your browser does not support the video tag.