My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0013107
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
833
>
2900 - Site Mitigation Program
>
PR0524607
>
ARCHIVED REPORTS XR0013107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:38 AM
Creation date
7/11/2019 9:15:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013107
RECORD_ID
PR0524607
PE
2950
FACILITY_ID
FA0016516
FACILITY_NAME
STOCKTON RAILYARD
STREET_NUMBER
833
Direction
E
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
833 E EIGHTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
USPCI M ems' < <br /> A Subsidiary of <br /> Union Pacific Corporation <br /> APR 2 3 <br /> ENVIRONMENT41. KALTH <br /> PERMIT/SERVICES <br /> April 22, 1992 <br /> Charles Hunt <br /> San Joaquin County <br /> Public Health Services <br /> 1601 E. Hazelton Ave. <br /> Stockton, CA 95201 <br /> Re. UPRR Diesel Pipeline Closure. <br /> Dear Charles, <br /> Pursuant to your previous correspondence concerning the closure of <br /> UPRR's Diesel pipeline I am providing the information you requested as outlined <br /> below. <br /> 1 ,2. . Permits for the soil gas survey and soil borings with the appropriate fees <br /> are enclosed. - <br /> 3. All borings will be sealed with bentonite pellets. <br /> 4. Tracer Research will complete their contractors file. <br /> 5. Drilling contractor is Precision Sampling Inc. which should have <br /> completed its contractor file. <br /> 6. USPCI's contractor file information is inclosed. <br /> 7. "Authorization to Release" is enclosed. <br /> 8. The laboratory will be Coast to Coast, Benecia, CA. <br /> 9. The pipeline will be rinsed by pumping water from the terminal end of <br /> the line to the yard. The rinsate will be stored in tanks currently in place <br /> at the waste water treatment plant at the yard and will be treated at that <br /> plant. Rinsate will be collected from the pipeline for analysis after three <br /> volumes have been pumped through the line. <br /> 5665 Flatiron Parkway- Boulder, Colorado 80301 • 3031938-5500 • Fax 3031938-5520 <br />
The URL can be used to link to this page
Your browser does not support the video tag.