My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0013107
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
833
>
2900 - Site Mitigation Program
>
PR0524607
>
ARCHIVED REPORTS XR0013107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:38 AM
Creation date
7/11/2019 9:15:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013107
RECORD_ID
PR0524607
PE
2950
FACILITY_ID
FA0016516
FACILITY_NAME
STOCKTON RAILYARD
STREET_NUMBER
833
Direction
E
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
833 E EIGHTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KPR c ' 92 1 c ; 1 7 F P Oe IISPCI 0-3 93e 5520 PAGE . 009 <br /> ;7 .Y <br /> 3 <br /> PERSONNEL <br /> One driller, two drillers helper, one supervisor will be required for this project. Key <br /> personnel are: <br /> J!rQZram_Mana r - Curt" Hull ". <br /> i <br /> Responsibilities include overall responsibility for all activities, personnel, and health and <br /> safety. <br /> Specific responsibilities include: client interface; coordination of all UPRR LUST work; <br /> compliance with all legal standards,policies and procedures; receipt and completed <br /> documentation for all contractors and subcontractors such as training, insurance, supplies <br /> and other services; reviewing health and safety plans, maintaining communication with <br /> site supervisor; approve changes to work plan and provide technical support:to on site <br /> supervisor. <br /> Project_Mam= Richud !Q, Ditmars <br /> Responsibilities include oversight of all activities, personnel, and health and safety. <br /> Specific responsibilities include: client interface; coordination of all UPRR work; <br /> W compliance with all legal standards; policies and procedures; senior technical oversight <br /> including final review of all. documents and reports; personnel assignments; project <br /> quality control; scheduling; approving major changes to scope of work. + <br /> InStMmentation QlWifteA Persons - Personnel supplied by PES Environmental, Inc. <br /> ,j <br /> Sub Enyimntnmtal Inc, ; <br /> Responsible for supervision of all site acitivities and reporting including enforcement of <br /> . �3 <br /> the site health and safety plan. <br /> 3 <br /> Subcontractor - Tracer Rech Qorporatioxt <br /> I <br /> Responsible for all aspects of sail gas sampling, including probe placement' field van <br /> operation, GC operation, and QA/QC. <br /> ° Equipmeat <br /> 'F:1aDrrMAZST0C; TM-HSP--4/13M 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.