Laserfiche WebLink
CHANNEL STREET <br /> -34 <br /> Sidewalk RW-1 <br /> -33 VEW-3 33 MW-4 <br /> MW-2 <br /> - — concrete Pad ; MW-3 <br /> VEW 2 -i 4 <br /> � i -3 4 <br /> <001 Former ' i <br /> Tank -------- <br /> i <br /> Excavation VEW-1 ' RW-2 <br /> -'K -33 r W <br /> MW-5 �- - - - - - - Canopy <br /> MW-1 <br /> x O <br /> -34 ------------ ❑ <br /> ' � Q <br /> VEW-4 ' <br /> a E a <br /> � e � O <br /> Waste Building -33 0 In <br /> Oil Tank <br /> Access Hatch <br /> - - - - - - - - - - Channel Bulkhead it <br /> (Below) ri <br /> ri <br /> i� <br /> ii <br /> Concrete Deck Parking Area <br /> SOIL VENTING SYSTEM WITH ACTIVATED CARBON <br /> Conditions <br /> Venting wells VEW-1, VEW-2, VEW-3, VEW-4 <br /> Influent Vacuum -34 inches water column <br /> Influent Airflow From Soil 158 SUM <br /> System operated continuously from 6123193 except for periodic <br /> maintenance on the blower <br /> LEGEND <br /> Monitoring Well NOTES <br /> {� Recovery Well Site Sketch After <br /> RESNA Site Map <br /> Vapor Extraction Well <br /> All Locations Are Approximate <br /> -33 Vacuum in Inches Water Column <br /> 0 30 60 <br /> Approximate Scale <br /> 1"=30' <br /> VACUUM MEASUREMENTS FIGURE <br /> September 14, 1993 <br /> fFMAWY DATED Hada Octobersis93$Y DAZE CM Weber Enterprises PropertyP �eEti141 North EI Dorado StreetO 9Y DAtE Stockton, CA 93-011 <br />