My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011667
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
222
>
2900 - Site Mitigation Program
>
PR0009146
>
ARCHIVED REPORTS XR0011667
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 1:37:11 PM
Creation date
7/11/2019 11:25:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011667
RECORD_ID
PR0009146
PE
2960
FACILITY_ID
FA0004093
FACILITY_NAME
LIGHTHOUSE SCHOOL
STREET_NUMBER
222
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13910022
CURRENT_STATUS
02
SITE_LOCATION
222 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.0 PROJECT ORGANIZATION <br /> 5.1 Project Staffing/Chain of Command <br /> ' Titles Names Phone #/Pa er <br /> Project Manager: Ronnie Almero 714-440-7700/714-729-3991/ <br /> ' Field Safety Supervisor: Ronnie Almero 714-440-77001714-729-3991 <br /> tTechnical Supervisor: Trevor Santochi 714-440-7700/714-729-4887 <br /> Project Principal: Jimmy Allums 714-440-77001800-946-4645 <br /> PIN 91168464 <br /> Health & Safety Manager: Brian Slauzis 714-440-77001714-729-4879 <br /> ' Crew Size No <br /> Project Managers: 1 <br /> Field Safety Supervisor: 1 <br /> Equipment Operators: 1 or 2 <br /> Technicians: 0 <br /> ' Laborers: 0 <br /> Other (Specify:) 0 <br /> 5.2 Organization and Responsibilities <br /> CRC will oversee all phases of the project. The following management structure will <br /> be instituted for the purpose of successfully and safely completing this project. <br /> Project Manager: <br /> 1 The Project Manager will be responsible for implementing the project and obtaining <br /> necessary personnel or resources for the completion of the project. Specific duties <br /> ' will include: <br /> • Coordinating the activities of all subcontractors, to include informing them of <br /> ' the required Personal Protective Equipment (PPE) and ensuring their signature <br /> acknowledging this site Health and Safety Plan. <br /> • Selecting a Field Safety Supervisor (FSS) and field personnel for the work to <br /> be undertaken on site. <br /> 1 <br /> CRC Environmtntal Risk Management,Inc. Project k2100-250-2 <br /> American Savings Bank 222 North EI Dorado Street <br />' April 6, 1995 5 Stockton.California <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.