My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
308
>
3500 - Local Oversight Program
>
PR0544650
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 1:36:13 PM
Creation date
7/11/2019 11:52:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544650
PE
3528
FACILITY_ID
FA0003520
FACILITY_NAME
DENS AUTO REPAIR INC
STREET_NUMBER
308
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
149063301
CURRENT_STATUS
02
SITE_LOCATION
308 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Well Installation Work Plan <br /> DEN'S AUTO REPAIR <br /> 308 South E1.Dorado Street, Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. ADJACENT SUBSURFACE INVESTIGATIONS. . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 3.0. SCOPE OF WORK. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 3.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES.. . . . . . . . . . . . . . . . . . . 2 <br /> 3.2. DRILLING AND SOIL SAMPLE COLLECTION.. . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 3.3. MONITORING WELL INSTALLATION, DEVELOPMENT AND <br /> SURVEY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 3.4. GROUND WATER SAMPLING AND ANALYSIS. . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.5. PREPARATION OF REPORT OF FINDINGS. . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 4.0. FIELD PROCEDURES.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 4.1. DRILLING AND SOIL SAMPLING . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . 4 <br /> 4.2. MONITORING WELL COMPLETION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 4.3. WELL DEVELOPMENT AND SURVEY. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 4.4. GROUNDWATER SAMPLING PROCEDURES. . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 4.4.1. Static Water Level Measurements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 4.4.2. Well Evacuation.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 4.4.3. Sample Withdrawal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 4.4.4. Sample Handling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 4.5. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT. . . . . . . . . . . 7 <br /> FIGURES <br /> Figure I -Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 -Monitoring Well Design -HU2 <br /> Figure 4 -Monitoring Well Design -HU3 <br /> i <br /> i <br /> APPENDICES <br /> -_. Appendix A -..Site-Background Information <br /> Appendix B -Limited Soil and Groundwater Investigation <br /> Advanced GeoEnvironmental,Inc. <br /> I <br /> 1 ! <br />
The URL can be used to link to this page
Your browser does not support the video tag.