My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
308
>
3500 - Local Oversight Program
>
PR0544650
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 1:36:13 PM
Creation date
7/11/2019 11:52:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544650
PE
3528
FACILITY_ID
FA0003520
FACILITY_NAME
DENS AUTO REPAIR INC
STREET_NUMBER
308
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
149063301
CURRENT_STATUS
02
SITE_LOCATION
308 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Site Assessment Work Plan <br /> DEN'S AUTO REPAIR <br /> 308 South El Dorado Street, Stockton, California <br /> TABLE OF CONTENTS <br /> L <br /> SECTION PAGE <br /> LM 1.0. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> r <br /> 2.0. BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.1. REGIONAL GEOLOGIC/HYDROGEOLOGIC SETTING . . . . . . . . . : . . . . . . . 1 <br /> • 2.2. UNDERGROUND STORAGE TANK REMOVAL . .. . ... . . . . . . . . . . . . . . . . .. 2 <br /> L. <br /> 2.3. PREVIOUS SITE ASSESSMENT AND SAMPLING . . . . . . . . . . . . . . . . . . . . . 2 <br /> i 3.0. SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . :. . . . . . . . . . . . . 4 <br /> 3.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES . . . . . . . . . . . . . . . . . . . 4 <br /> 3.2. DRILLING AND SOIL SAMPLE COLLECTION . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.3. MONITORING WELL INSTALLATION, DEVELOPMENT, AND <br /> i. SURVEY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . 5 <br /> 3.4. GROUND WATER SAMPLING AND ANALYSIS . . . .. . . ... . . . . . . . . . . . . . . 6 <br /> 3.5. PREPARATION OF REPORT OF FINDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 4.0. FIELD PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 4.1. PILOT SOIL BORING . . . . . . . . . . . . . . . . . . : . . 6 <br /> L 4.2. WELL COMPLETION AND WELL ELEVATION SURVEY 7 <br /> 4.3. WELL DEVELOPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . 7 <br /> 4.4. GROUNDWATER SAMPLING PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> L 4.4.1. Static Water Level Measurements . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 4.4.2. Well Evacuation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 4.4.3. Sample Withdrawal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> L 4.4.4. Sample Handling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 <br /> 4.5. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT . . . . . . . . . . 9 <br /> L <br /> FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 '_Site Plan <br /> V Figure 3 -Proposed Monitoring Well Design -HUI <br /> Figure 4 -Proposed Monitoring Well Design -HU2 <br /> Figure 5 -Proposed Monitoring Well Design -HU3 <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.