Laserfiche WebLink
'p Page of <br /> Drillers Daily Report <br /> Rig No. L� " Chase Vehicle �3. 7—/� Date <br /> Project Name r� r^� a Job No. <br /> CEient <br /> Project Location <br /> Perdiem Y N Client No. <br /> Driller T M Hours <br /> Driller's Helper Hours Perdiem Y N <br /> Rig Mileage Start Chase Mileage Start Total Hazardous <br /> Rig Mileage Finish Chase Mileage Finish Premium Hours <br /> Drilling Summary <br /> Boring Boring Depth Total Continuous Core Casing Samples Remarks <br /> No. From-To Footage Sampler Footage Depth Taken <br /> Daily Hours Hours Flours Remarks <br /> Worked Chargeable <br /> Load <br /> Travel <br /> Drill <br /> Backfill Borings <br /> Set Wells <br /> Decon <br /> Stand-by <br /> Other(describe) <br /> TOTAL <br /> Materials Supplied Additional Services Clocked In/Out Hours <br /> PVC/Other' 2-inch 4-inch 6-inch Other* Steamcleaner/Gen Start Yard AM PM <br /> Screen-5'sections Rental End Yard AM PM <br /> Screen-10'sections Concrete Cutter Start Field AM PM <br /> Blank-5'sections Bobcat/Forklift End Field AM PM <br /> Blank-10'sections Welder Start Yard AM PM <br /> Top Caps Pump(specify size) End Yard AM PM <br /> Bottom Plugs SAFETY EQUIPMENT Lunch Hour <br /> Locking Tops Tyvek Suits each Start AM PM <br /> Sand Pack Rubber Gloves pair AM PM <br /> Cartridges sets <br /> Bentonite Pellets <br /> Breathing Air tanks <br /> Bentonite Grout <br /> Cement Client Remarks <br /> Bentonite Powder <br /> Utility Box <br /> Concrete <br /> Asphalt Patch <br /> Drums <br /> Sample Tubes <br /> Other(describe) <br /> _ <br /> L-2ISt&94l Cli to proval <br />