Laserfiche WebLink
v v <br /> FIRESTONE TIRE AND RUBBER COMPANY <br /> STOCKTON, CALIFORNIA <br /> SOIL SAMPLING RESULTS <br /> On Segcember 10, 1991, additional soil samples were taken at the Firestone <br /> facility located at 400 N. El Dorado St, Stockton, California (See Figure 1). The <br /> soil :ampling locations and analysis followed the approved workplan submitted <br /> to the Public Health Services (PHS), San Joaquin Counti. Soil samples were <br /> taken at two borings located on the north and south side of the former Tank 5 site <br /> and at former tank 6 and 16 locations. <br /> Mr. Harlin Knoll a PHS inspector and environmental health specialist was on- <br /> site during the soil sarapling activities. Mr. Harlin wit-aessed the sampling <br /> techniques and directed the number, the location, and the depths of the samples <br /> at Tanks 6 and 16. Additionally, at the conclusion of the drilling work at the <br /> Tank 5 location, Mr. Harlin assist in the decision to analyze 3 soil samples from <br /> each boring at the following depths: 15 feet, 30 feet, and 40 feet below grade. <br /> The locations of the soil sampling work is depicted on Figure I. Soil sampling <br /> results reported by the laboratory are summarized on Table 1. Laboratory data <br /> sheets and chain-of-custody forms are presented in Attachment A. Following is <br /> a brief discussion of the sample activities, results, conclusions and <br /> ecommendations for Tanks 5, 6, and 16. <br /> T=k 5 <br /> Soil samples were taken from two borings located approximately five feet south <br /> and north of the Tank 5 excavation. The drilling work was performed by <br /> Spectrum Exploration. A geologist from Kleinfelder log the borings, retrieved <br /> samples, and completed the chain-of-custody for laboratory analysis. Boring <br /> logs are presented in Attachment B. Soil samples were taken through a hollow <br /> stem auger using a split spoon. Each soil sample was sealed with teflon tape, <br /> capped, logged, and placed on ice. <br /> Both borings were completed to a depth of 41.5 feet. No free water was <br /> encountered during the drilling work. Soil samples were taken at 5 foot <br /> intervals and a PID was used to provide field information during the drilling <br /> work. Based on the boring results and after consultation with Harlin Knoll, <br /> samples from the 15, 30, and 40 foot locations were selected for laboratory <br /> analysis. The 15 foot sample provided information on potential chemical <br /> distribution near the invert of the former tanks. Thi 30 and 40 foot samples <br /> provided additional vertical and horizontal information on the potential <br /> chemical distribution throughout the soil profile. <br /> The results of the soil analysis work as reported by Curtis and Tompkins <br /> indicates no chemical migration within the soil profile sampled on September <br />