Laserfiche WebLink
-Work rder Detail <br /> 5742360: Regulatory SPCC 12-Month Inspection of Diesel Tank Components <br /> This completed official regulatory Pini work order record must be copied and transmitted to the facility Chief for recordkeeping at the Facility. <br /> Asset: TESTK-6402 Standby Generator Diesel Fuel Tank No. 2 <br /> Location: TES Tesla Treatment Facility <br /> 9000 West Vernalis Road Tracy, CA. 95377 <br /> Cl: <br /> Sched Start: Site: WS Shop: WSCM <br /> Sched Finish: Priority: 6 Supervisor: <br /> Target Start: 4/5/19 Work Type: PM Lead: <br /> Actual Start: PM Number: WS-TES-TNK-0028 Sob Pian: WS-FUL-TNK-INP-09-001 <br /> Actual Finish: Status: APPR ]P Description: 12-Month EMT Inspection of Diesel <br /> Tank Components <br /> Report Date: 3/28/19 Parent: Crew: CM-EMT2 <br /> Reported By: SFONG Failure Class: Service: <br /> On Behalf Of: Problem Code: Service Group: <br /> Phone: 650-871-2013 GL Account: 25940-232422-10000-10029996+0016 LClassification: <br /> .. Plan Dewosequence Task IDs <br /> scription <br /> Sequence Task ID Description Status Point Value Date Observa <br /> 0 10 12-Month EMT Inspection of Diesel Ta omponents 1. Test local APPR 0 <br /> audible and visual aiarms. <br /> 2. Test control panel indicator lights. <br /> 3. Check that a ontrol panel wiring and cables are free of <br /> corrosion, perly secured and tighten all terminal connections, <br /> 4. Test> alarm for local and remote activation. <br /> 5. Confirm that loc a indication matches SCADA data point <br /> display. <br /> 6. Test tank leak detection system for operation. <br /> 7. Test and calibrate local dial gauge display. <br /> 8. Test and calibrate tank level monitoring. <br /> 9. Verify that all electrical and communication connections are tight <br /> April 4, 2019 at 8:01:17 AM ADT 1 1 2 <br />