Laserfiche WebLink
Worktrder Details <br /> 5742358: Regulatory SPCC 12-Month Inspection of Diesel Tank Components <br /> This completed official regulatory PM work order record must be copied and transmitted to the facility Chief for recordkeeping at the facility. <br /> Asset:TESTK-8401 Standby Generator Diesel Fuel Tank No. 1 <br /> Location:TES Tesla Treatment Facility <br /> 9000 West Vernalis Road Tracy, CA. 95377 <br /> Cl: <br /> Sched Start: Site; WS Shop: WSCM <br /> Sched Finish: Priority: 6 Supervisor: <br /> Target Start: 4/5/19 Work Type: PM Lead: <br /> Actual Start: PM Number: WS-TES-TNK-0023 Job Plan: WS-FUt_-TNK-INP-09-001 <br /> Actual Finish: Status: APPR JP Description: 12-Month EMT Inspection of Diesel <br /> Tank Components <br /> Report Date: 3/28/19 Parent: Crew: CM-EMT2 <br /> Reported By: SFONG Failure Class: Service: <br /> On Behalf Of: Problem Code: Service Group: <br /> Phone:1650-871-2013 GL Account: 25940-232422-10000-10029996+0016 Classification: <br /> Job Plan Description <br /> wosequence Task IDs A <br /> Measurement <br /> Sequence Task ID Description Status Point Value Date Observw <br /> 0 10 12-Month EMT Inspection of Diesel Tank omponents 1. Test local APPR 0 <br /> audible and visual alarms. <br /> 2.Test control panel indicator lights. ✓r <br /> 3. Check that all control panel wiring and cables are free of <br /> corros C>91111erly secured and tighten all terminal connections. <br /> 4. Test High alarm for local and remote activation. <br /> 5. Confirm that local vel indication matches SCADA data point <br /> display. <br /> 6. Test tank leak detection system for operation. V <br /> 7. Test and calibrate local dial gauge display. PyO f` <br /> S.Test and calibrate tank level monitoring. <br /> 9. Verify that all electrical and communication connections are tight <br /> April 4, 2019 at 7;48:56 AM PDT 1 / 2 <br />