Laserfiche WebLink
Spill Prevention, Control and Countermeasure Plan <br /> Tesla Treatment Facility <br /> RECORD OF SPCC PLAN REVIEW <br /> Log of Plan Reviews <br /> Notwithstanding compliance with 40 CFR§112.5(a), the Spill Prevention Control and <br /> Countermeasure(SPCC) Plan must be reviewed and evaluated once every five(5)years from <br /> the date the SPCC Plan was last certified. Any amendments must be implemented as soon <br /> as possible but no later than six (6) months. A Professional Engineer must certify any <br /> technical amendment to the SPCC Plan. <br /> Plan Review Date: <br /> I have completed a review and evaluation of the SPCC Plan for the Tesla Treatment Facility, <br /> 9000 W. Vernalis Road, Tracy, California, and will (will not) amend the SPCC Plan as a <br /> result. <br /> Name of Reviewer: <br /> Signature of Reviewer: <br /> Plan Review Date: <br /> I have completed a review and evaluation of the SPCC Plan for the Tesla Treatment Facility, <br /> 9000 W. Vernalis Road, Tracy, California, and will (will not) amend the SPCC Plan as a <br /> result. <br /> Name of Reviewer: <br /> Signature of Reviewer: <br /> Plan Review Date: <br /> I have completed a review and evaluation of the SPCC Plan for the Tesla Treatment Facility, <br /> 9000 W. Vernalis Road, Tracy, California, and will (will not) amend the SPCC Plan as a <br /> result. <br /> Name of Reviewer: <br /> Signature of Reviewer: <br />