My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VERNALIS
>
9000
>
2800 - Aboveground Petroleum Storage Program
>
PR0541548
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:28:07 PM
Creation date
7/11/2019 4:19:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541548
PE
2832
FACILITY_ID
FA0009758
FACILITY_NAME
SFPUC Tesla Treatment Facility
STREET_NUMBER
9000
Direction
W
STREET_NAME
VERNALIS
STREET_TYPE
Rd
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
9000 W Vernalis Rd
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention, Control and Countermeasure Plan <br /> Tesla Treatment Facility <br /> LOG OF SPCC PLAN AMENDMENTS <br /> In accordance with 40 CFR§112.5(a),the SPCC Plan must be amended when there is a change in the facility <br /> design,construction,operation,or maintenance that materially affects its potential for a discharge as described <br /> in 40 CFR§112.1(b). Any amendments must be implemented as soon as possible but no later than six (6) <br /> months. A Professional Engineer must certify any technical amendment to the SPCC Plan. <br /> Revision Date Reason for Revision Sections Revised Revised By: <br /> Initial SPCC Plan for installation of the Initial SPCC Plan. Stantec Architecture <br /> 1 05/12/2011 standby power generators and Inc. (Andrew Yang, <br /> aboveground bulk storage tanks P.E.). <br /> facility. <br /> Five(5)year review and update of Revised Sections 1.1, Stantec Architecture <br /> 2 03/14/2018 SPCC Plan. 1.4.2, 1.4.3, 5.3, 5.4 and Inc. (Andrew Yang, <br /> 5.5,Appendices C,D,E,F P.E.). <br /> and G. <br /> Response to San Joaquin County Revised Parts 1 through 5 LEE Incorporated <br /> Environmental Health Department to follow sequence used in (Ellen Lee,P.E.). <br /> 3 04/05/2019 (SJCEHD)inspection report,and the SPCC Rule; oil-filled <br /> addition of oil-filled transformer at the transformer included; <br /> Electrical Building. revised, updated and re- <br /> organized appendices. <br />
The URL can be used to link to this page
Your browser does not support the video tag.