Laserfiche WebLink
Spill Prevention, Control and Countermeasure Plan <br /> Tesla Treatment Facility <br /> LOG OF SPCC PLAN AMENDMENTS <br /> In accordance with 40 CFR§112.5(a),the SPCC Plan must be amended when there is a change in the facility <br /> design,construction,operation,or maintenance that materially affects its potential for a discharge as described <br /> in 40 CFR§112.1(b). Any amendments must be implemented as soon as possible but no later than six (6) <br /> months. A Professional Engineer must certify any technical amendment to the SPCC Plan. <br /> Revision Date Reason for Revision Sections Revised Revised By: <br /> Initial SPCC Plan for installation of the Initial SPCC Plan. Stantec Architecture <br /> 1 05/12/2011 standby power generators and Inc. (Andrew Yang, <br /> aboveground bulk storage tanks P.E.). <br /> facility. <br /> Five(5)year review and update of Revised Sections 1.1, Stantec Architecture <br /> 2 03/14/2018 SPCC Plan. 1.4.2, 1.4.3, 5.3, 5.4 and Inc. (Andrew Yang, <br /> 5.5,Appendices C,D,E,F P.E.). <br /> and G. <br /> Response to San Joaquin County Revised Parts 1 through 5 LEE Incorporated <br /> Environmental Health Department to follow sequence used in (Ellen Lee,P.E.). <br /> 3 04/05/2019 (SJCEHD)inspection report,and the SPCC Rule; oil-filled <br /> addition of oil-filled transformer at the transformer included; <br /> Electrical Building. revised, updated and re- <br /> organized appendices. <br />