Laserfiche WebLink
210 East Wetmore Street PR0544025 <br /> June 26, 2019 Program: APSA <br /> PHOTO 2: 4.2.11 of the SPCC plan states no portable containers. Two 55 gallon drums of petroleum product were observed during the inspection. <br /> 4.2. 10. Visible Discharges [40 CFR 112.8(c)(10)1 <br /> Visible discharges from any container or appurtenance — including seams, gaskets, pip <br /> pumps, valves, rivets, and bolts — are quickly corrected upon discovery. Oil is prorY <br /> removed from berm areas and disposed of according to the waste disposal me <br /> described in Section 5.0. of this Plan. <br /> 4.2. 11 . Mobile and Portable Containers [40 CFR 112.8(c)(11)1 <br /> This section is not applicable since there are not portable ASTs at this facility. <br /> 4.3. TRANSFER OPERATIONS, PUMPING AND IN-PLANT <br /> PROCESSES [40 CFR 112.8(d)] <br /> Transfer operations at this facility include: <br /> • Waste oil transfer into the corresponding ASTs. <br /> The filling of facility vehicles at the fueling ASTs via the appropriate disj <br /> • The transfer of oil from tanker trucks at the unloading area. <br /> • The transfer of oil to vehicles in the maintenance areas. <br /> Lydia Baker, REHS Page 2 of 5 <br />