My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
2900 - Site Mitigation Program
>
PR0505525
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 10:54:12 PM
Creation date
7/11/2019 4:50:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br /> ^'- -. �:,. a 'E - r _ ,.ir• t A - = tom' 'I- _ <br /> ( r 27 A.- 'z-' _ <br /> AGE-NC Project No..95-0128 _. <br /> Page 3 of 3 K V. <br /> r x <br /> portion'of significantly= impacted ground water should of address :tle plume of =?_ <br /> impacted ground water a5 presented in Figure l and help_control£Iirther plume migration: <br /> } s .AGE has performed a•ground water extraction pilot test at.the site which:was-successfully <br /> - "completed: Based on cozlserva#ive calculations of:theplu�me volume and_concentraions;AGE <br /> . ._ . ,_. <br /> _believes that the ground water extractiori_system Vvould`opera te_for approxim4fely'36 rlionths z <br /> - <br /> The calculations are attached - <br /> 04 <br />- ! The-estimated-annual cost for SVVIAS is approximately,$6,666 while' the estimated.annual <br /> cosh f6r ground water_extraction with=an SVE is .$95,000. The duratl6n.of IAS.is 36'to-,60 = <br /> months.with atotal_=cost of_$325,000,'while the duration of ground water'extraction with <br /> r <br /> =-limited SVE ranges from=18 to_36 rnoriths with a total:cost of�$285,000(Table <br /> E <br /> - If you_have-any_questidnsor comments,please contact me at(209)467-1006 ° <br /> Sincerely, <br /> Advanced'GeoEnvlronmental,Inc. <br /> jfI <br /> 1. <br /> -- William Littler -Robe <br /> Project Geologist f iProj t Geos s 4F-CA - 4� <br /> ,Cegister d eo ogist No. 6709 r" . <br /> Y- <br /> .. <br /> . Enclosures <br /> W-Richard Leland <br /> `e T <br /> ;f-- <br /> �.rcc- Advancid:Ge'oEnv9ronmentaI,Incti _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.