My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
2300 - Underground Storage Tank Program
>
PR0231841
>
BILLING PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 11:57:58 AM
Creation date
7/12/2019 12:04:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231841
PE
2361
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
01
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Arco AIL Ak <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) I I I _ I I 1 1 -11 <br /> BUSINESS NAME(Same as FACILITY NAME) 3. <br /> BUSINESS SITE ADDRESS NO 3. <br /> 103, CITY 104. <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> (23 CCR 263212634,263_8,264I) -__- _ _ ------�-- <br /> MONITORING EQUIPMENT IS SERVICED -I.ANNUALLY 99.OTHER( � �')�S ci 490-34 <br /> ❑ 490.36 <br /> III.MONITO G LOCATIONS <br /> ❑ L NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49o-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> Kr 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 4x)-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL A ARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED E] c.PRESSURIZED F1d.UNDER VACUUM 490-6 <br /> - ---------- <br /> - <br /> PA_NE_L_MANUFACTURER: 4x1�' I MODEL#: Qdv 490-8 <br /> LEAK SENSOR MANUFACTURER: 490-9' MODEL#(S): L 490-10 <br /> .AUTOMATIC TANK GAUGING(ATG) YS EM USED TO MOMTOR SINGLE WALL TAN R§2643) JJO-11 <br /> NUFACTURER: MODEL_#: 490-13 <br /> _ IN-TANK PROB -- R. ------- 490-14. MODEL MO_D_E_L _#(S): ----- ------ <br /> [N-TANK 490=is <br /> -LEAK TEST FREQUENCY: US ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490�6 <br /> ❑ d.MONTHLY _ _❑ e.OTHER(Specify): 40-17 <br /> 0-8 <br /> PROGRAMMED TESTS: Ela.0.1 g.p.h. ❑ b.0.2 g.p.h. Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 40-20 <br /> E] 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> 490-zz <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 491-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 4990-25 <br /> E]99.OTHER (Specify): 4990-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28- <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:Va.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> PANEL MANUFACTURER: ,� VCO 49130 , MODEL#: -27S-Sd4o _ �i�_1 490-31 <br /> LEAK SENSOR MANUFACTURER: 490-32 i MODEL#(S): L - 490-33 <br /> --- ---- --=`��_✓_------- - •--•-------- - ---r�----�--------------- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. / YES Xb.NO 490-35 <br /> MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p h.LEAK TESTS AND RESTRI TS QR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2636FICI-�_L 490-36 <br /> MLLD MANUFACTURER(S): V r` 490-37 MODEL#(S): L D F9` X 3x <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(E LD)THAT RourINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> M <br /> _ELLD_AACTURER(S)_NUF - "'0' ! MODEL-MODEL#(S)_--------------------- -490--41 <br /> _ _ _ _ --- __ _ <br /> PROGRAMMED IN LINE LEAK TEST_- ❑ L MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490.42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 4'W-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-44 <br /> 4.PIPE INTEGRITY JESTING 490.45 <br /> TEST FRE UENCY IN, a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER S eci ) 490-46490-47 <br /> ❑ 5.VISUAL PIPE MO RING. 4x)-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> *Allowed for monitoring of unburied emergent,generator fuel piping only per HSC§25281.5(6)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 490-50 <br /> ❑ T NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) <br /> 490-52 <br /> 490-s3 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.