Laserfiche WebLink
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION 1.'>M PLAN 0 C HANGS OF INFORMATION Mol. <br /> PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. M02. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> FACILITY NAME �� ' Q f- M03. <br /> ! <br /> FACILITY SITE ADDRESS DD C k~Wto <br /> LEI <br /> M04. I CITY % ytg5. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06. <br /> accordance with the equipment manufacturers'instructions,or an ally,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): Mol. <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location ofeach sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> M NITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mlo. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT I: a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE Fjd.UNDER VACUUM MI I. <br /> PANEL MANUFACTURER: M12. MODEL#: V M13. <br /> LEAK SENSOR MANUFACTURER: M14. MODEL#(S): MI5• <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16. MODEL#: Mlz <br /> IN-TANK PROBE MANUFACTURER: MIB. MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M20. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): M22. M23. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26. M27. <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> ❑ 99.OTHER(Specify): M28. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mao <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE d.UNDER VACUUM M31. <br /> nor . <br /> PANEL MANUFACTURER: M32. MODEL#: M33. <br /> U-l 1 <br /> LEAK SENSOR MANUFACTURER: �-I rJCY 1"� (� M34. MODEL#(S): Mas. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? r�a.YES ❑ b.NO M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? u a.YES b.NO M3z <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUT NELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS O. BUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED ` /1 �,p rte!n Jam' <br /> MLLD MANUFACTURER(s): tl i(�_�P_pY� 344-M38 MODEL#(S): S1 p 7/�/`,!/ r- (2-DV M39 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: M40. MODEL#: M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. M46. <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED** M47. <br /> *Requires agency approval **Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25281.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) M48. <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />