Laserfiche WebLink
CERS Consolidated Emergency Response/Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY(Check all that apply): C11, <br /> Q 1.VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; ■❑3.TELEPHONE; <br /> ❑4.PAGERS; ❑5.ALARM SYSTEM; M 6.PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY(Check all that apply): C12. <br /> ❑1.VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; 0 3.TELEPHONE; <br /> ❑4.PAGERS; ❑5.ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: <br /> PRIMARY EMERGENCY COORDINATOR NAME: Brian Tillman PHONE NO.:(209)953-8585 PHONE No.: (209) 598-3182 <br /> ALTERNATE EMERGENCY COORDINATOR NAME:Tammy Magallanes PHONE NO.:(209)953-8596 PHONE NO.: (209) 662-9342 <br /> ❑Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br /> Note:If more than one alternate emergency coordinator is designated,attach a list in order of responsibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility's procedures for containing spills and preventing and mitigating releases fires and/or explosions. <br /> Di <br /> ❑■ 1. MONITOR FOR LEAKS,RUPTURES,PRESSURE BUILD-UP,ETC.; <br /> ❑2. PROVIDE STRUCTURAL PHYSICAL BARRIERS(e.g.,Portable spill containment walls,built-in berms); <br /> Q 3. PROVIDE ABSORBENT PHYSICAL BARRIERS(e.g.,Pads,spill pigs,spill pillows); <br /> ❑4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; ?�S <br /> ❑5. LINED TRENCH DRAINS AND/OR SUMPS; A ? <br /> ❑6. AUTOMATIC FIRE SUPPRESSION SYSTEM; REC' <br /> ❑7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> ❑8. STOP PROCESSES AND/OR OPERATIONS; J U L 19 2019 <br /> ❑9. AUTOMATIC/ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM, <br /> UT OFF WATER, <br /> Q 0.CALL 9-1 FOR PUBLIC <br /> ELECTRICAL UTILITIES; <br /> 11IEMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; ENVIRONMENTAL HEALTH <br /> ❑■ 12.NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; DEPARTMENT <br /> ❑' 13.ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> [114.PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> Q 15.REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br /> 16.HIRE LICENSED HAZARDOUS WASTE CONTRACTOR;- <br /> 17. <br /> ONTRACTOR;17.USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> ❑18.VACUUM SUCTION USING APPROPRIATE VACUUM(e.g.,Intrinsically safe)FOR SPILL CONTROL AND/OR CLEANUP; <br /> 19.DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> 20.PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> ❑ <br /> 21.OTHER(Specify): D2. <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S)WILL BE USED TO BEGIN EVACUATION OF THE FACILITY(Check all that apply): <br /> ❑1. BELLS; i.2 <br /> ❑2. HORNS/SIRENS; <br /> 0 3. VERBAL(i.e.,Shouting); <br /> El 4. OTHER(specify): Portable Radio <br /> THE FOLLOWING LOCATION(S)WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S)(e.g.,Parking lot,street comer): <br /> Uncovered Parking Area <br /> Note:The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: E4. <br /> ❑1.WRITTEN PROCEDURES DESCRIBING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> 2.EVACUATION MAP(S)DEPICTING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> ❑3. OTHER(Specify): E5. <br /> Note:Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan. <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES(Check one of the following): F <br /> 1. HAVE BEEN DETERMINED NOT NECESSARY; <br /> ❑2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE(Specify): F2 <br /> Note:Advance arrangements with local fire and police departments,hospitals,state and local emergency response teams,and/or emergency services <br /> contractors should be made for your facility,if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev.03/07/17 Page 2 of 4 <br />