Laserfiche WebLink
(0- 3/- pot( <br />104. Financial responsibility documents have been submitted and we will be submitting <br />annually. <br />105. Tank forms will be submitted to the EHD with any new changes. Current forms <br />have been submitted. <br />106 & 202. Current and approved monitoring and response plans will be kept on site and <br />have been uploaded into cers. <br />112. We will make sure that positive shutdown for the power out/sensor out(fail safe) of <br />the submersible turbine pump sensors will be able to be verified <br />203. We will report any releases from the primary containment that is not cleaned up with <br />in 8hr of detection or any release that escapes the secondary containment will be reported <br />to the EHD within 24hrs and a full report with in 5 working days. <br />204. We will make sure that D.O attach the alarm history report with any documentation <br />that is required. <br />205. We will remind our D.O to complete the inspection report every month and leave a <br />copy for the site. <br />206. We will make sure that D.O complete the employee training for Balwinder Singh. <br />306. We will fix the fuel leak that was found at ancillary equipment in the diesel <br />submersible turbine pump sump will be done by a properly licensed, trained and certified <br />contractor. <br />�k eCa<<- f e)(3 7- A- G49t+pn4Qnf.- <br />Land e c, <br />C S (,�2��°L' aril <br />