Laserfiche WebLink
(0 - P 7-/C) <br />3. The UST tank forms have been submitted to cers. <br />4. Financial responsibility documents have been submitted and we will be submitting <br />annually. <br />5&6. Current and approved monitoring and response plans will be kept on site and have <br />been uploaded into cers. <br />7. We will document all alarms and responses and maintain the maintenance records. <br />11. Monitoring equipment will be maintained to be able to detect a leak at the earliest <br />possible opportunity by repositioning the sensor to the lowest part of the stp sump <br />13. All monitoring equipment will be maintained to activate an audible and visual alarm <br />or stop the flow of product at the dispenser when it detects a leak. <br />21. Any water that can enter into the secondary containment by precipitation or <br />infiltration will be remove and dispose properly and make it haz waste determination per <br />titile 22 haz waste regulations and manage it accordingly. <br />23. We will insure that D.O check and note the correct dates for secondary containment <br />test for monthly inspection reports insure that D.O performs monthly inspection at this <br />facility includes all of the required information on the reports. <br />23c. We will make sure that monthly D.O reports will be found on site for the last 12 <br />months. <br />23c. Insure that D.O documents all the alarms and attach the alarm history report for the <br />last 12 months and responded to it appropriately. <br />2y, Iq-n1\ be {one ah +-iv"e, tVe✓9 12 "ori � 6y \ ' CC, ?r dry <br />C-,-, it� ti c- hrcl'An,5, <br />L-0"� �dd' 09 �s�40 <br />