Laserfiche WebLink
3 --,�)1- ) P- <br />109&112 Positive shutdown for the turbine sump sensor has been restored. Annual line <br />tightness test will be done if positive shut down is not working. <br />110. Annual line leak detector test will be done every 12 months. <br />109. Test result will be submitted with in 30 days of the test. <br />SQs V,`('.e S4,,,-� r <br />�-Q �2 Q �- © CJ rr C <br />(^ P 4^/1�7 <br />