My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
2300 - Underground Storage Tank Program
>
PR0231841
>
COMPLIANCE INFO 2011 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 1:58:23 PM
Creation date
7/12/2019 1:58:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2017
RECORD_ID
PR0231841
PE
2361
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
01
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT CONTINUED <br />Facility Cherokee Lane Service Station Facility 900 SCherokee LnLodi, CA Inspection <br />S. . <br />Name: Address: Date: Oct 29, 2012 <br />SUMMARY OF VIOLATIONS <br />VIOLATIONS <br /># <br />C1 <br />C2 <br />M <br />Code Section <br />HSC = CA Health and Safety Code; CFR = Code of Federal Regulations <br />C1 = Class 1 violation; C2 = Class 2 violation, M = Minor violation <br />tank form for each tank. <br />Non -Pressurized Piping (continued) <br />702 <br />Complete and submit a copy of the monitoring and response plans for approval by the EHD by 11-29-12. <br />An approved copy will be returned for your records. <br />CCR 2643(e) <br />Biennial tightness test of gravity piping not performed (pre -January 1, 1984) (M7) <br />703 <br />the test reports to the EHD within 30 days of the tests. <br />205. The October 2011, November 2011, December 2011, January 2012, February 2012, March 2012, <br />CCR 2643(d) <br />Triennial line test for conventional suction piping not performed (pre -January 1, 1984) (M1) <br />shall be retained on site. Locate and ensure that copies of the previous twelve months of designated <br />Other Violations <br />999 Other: <br />See attached "Continuation — Official Inspection Report" for violation(s) not listed above. <br />SUMMARY OF VIOLATIONS <br />CLASS I, CLASS II, or MINOR -Notice to Comply) <br />On site to conduct a routine inspection and witness the annual monitoring system certification testing. <br />104. Current financial responsibility documents have not been submitted to the EHD. Current financial <br />responsibility documents are required to be submitted annually. Complete and submit a copy of the <br />financial responsibility by 11-29-12. <br />105. UST diesel, 91, 87A(west), and 8713(east) tank forms on file with the EHD are not current. Any <br />change of information on these forms must be submitted to the EHD within 30 days of the changes. <br />Immediately complete and submit a copy of the facility and tank forms to the EHD. Complete a separate <br />tank form for each tank. <br />106 & 202. Current approved copies of the monitoring and response plans were not found on site nor on <br />file with the EHD. The monitoring and response plans must be current and approved by the EHD. <br />Complete and submit a copy of the monitoring and response plans for approval by the EHD by 11-29-12. <br />An approved copy will be returned for your records. <br />109. Annual monitoring system certification, leak detector testing, and spill container testing were <br />performed on 10-31-11 and a test report was not submitted to the EHD until 7-11-12(six months late). A <br />copy of the test report must be submitted within 30 days of the tests. Ensure that you submit a copy of <br />the test reports to the EHD within 30 days of the tests. <br />205. The October 2011, November 2011, December 2011, January 2012, February 2012, March 2012, <br />June 2012, July 2012, August 2012, and September 2012 designated operator monthly inspection <br />reports were not on site. Designated operator monthly inspection reports for the previous twelve months <br />shall be retained on site. Locate and ensure that copies of the previous twelve months of designated <br />monthly inspection reports are maintained on site. Submit copies to the EHD by 11-29-12. <br />310. A small amount of liquid was found in the #9 satellite dispenser sump sufficient to raise the bravo <br />float but not enough to trip the shear valve. If water could enter into the secondary containment by <br />precipitation or infiltration, it must be removed and disposed of properly. During the inspection the <br />ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT END'S CURRENT HOURLY RATE. <br />Inspector <br />Received By: <br />LV,/mid E� h <br />Title: <br />EHD 23-02 Rev 04/19/12 Page 3 UST INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.