Laserfiche WebLink
UPCF UST -D (12/2007) 1/4 <br />UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Pae 1 of 2) <br />TYPE OF ACTION ❑ 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION <br />490-1 <br />PLAN TYPE ❑ 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />490-2 <br />(Check one item olily) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S). <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) - - <br />1 <br />BUSINESS NAME (Same as FACILITY NAME) <br />3. <br />BUSINESS SITE ADDRESS 103. <br />CITY <br />104. <br />H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency <br />specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel. <br />23 CCR §2632,2634,2638,2641)_ <br />ER S eci <br />MONITORING EQUIPMENT IS SERVICED ❑ 1. ANNUALLY [199. OTHfy) <br />(P � <br />490-3a <br />490-3b <br />III. MONITORING LOCATIONS <br />❑ 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑ 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR §2632, <br />2634)490-4 <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br />❑ 1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />490-5 <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS. (23 CCR §2632,2634) <br />SECONDARY CONTAINMENT IS: ❑ a. DRY El b. LIQUID FILLED ❑ c. PRESSURIZED E] d. UNDER VACUUM <br />490 6 <br />PANEL MANUFACTURER: 496-7. <br />MODEL #: <br />490-8 <br />LEAK SENSOR MANUFACTURER: 490-9. <br />MODEL #(S): <br />490-10 <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). (23 CCR §2643) <br />490-11 <br />PANEL MANUFACTURER: 490-12. MODEL #: <br />490.13 <br />IN-TANK PROBE MANUFACTURER: 490.14. MODEL #(S): <br />490-15 <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />490-16 <br />❑ d. MONTHLY ❑ e. OTHER (Specify): <br />490-17 <br />PROGRAMMED TESTS: ❑ a. 0.1 h. ❑ b. 0.2 h. ❑ c. OTHER <br />g•P� g•P• (Specify): <br />490-18 <br />490-19 <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION (23 CCR §2646.1): <br />490-20 <br />El 4. WEEKLY MANUAL TANK GAUGING (MTG) (23 CCR §2645). TESTING PERIOD: ❑ a. 36 HOURS [Ib. 60 HOURS <br />490-21 <br />90 zz <br />❑ 5. TANK INTEGRITY TESTING (23 CCR §2643.1): <br />490-23 <br />TEST FREQUENCY: Ela. ANNUALLY Elb. BIENNIALLY [:1c. OTHERS eci <br />(P fY)� <br />490-24 <br />490-25 <br />El99.OTHER (Specify): <br />490-26 <br />490-27 <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />❑ 1. CONTINUOUS MONITORING OF PIPE/ PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br />490-28 <br />VISUAL ALARMS. (23 CCR §2636) <br />SECONDARY CONTAINMENT IS: ❑a. DRY ❑b. LIQUID FILLED ❑c. PRESSURIZED ❑d. UNDER VACUUM <br />490-29 <br />PANEL MANUFACTURER: ago-3o <br />MODEL #: <br />0-90-31 <br />LEAK SENSOR MANUFACTURER: 490-32 <br />1 MODEL #(S): <br />490-33 <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ❑ a. YES ❑ b. NO <br />490-34 <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />490-35 <br />❑ 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2636 <br />490-36 <br />MLLD MANUFACTURER(S): 490-37 MODEL #(S): <br />490-38 <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS (23 CCR §2636) <br />490-39 <br />ELLD MANUFACTURER(S) 49"17 MODEL #(S): <br />49041 <br />PROGRAMMED IN LINE LEAK TEST: ❑ 1. MINIMUM MONTHLY 0.2g.P. h. El2. MINIMUM ANNUAL 0.1 g.p.h. <br />490-42 <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />490-43 <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />49044 <br />❑ 4. PIPE INTEGRITY TESTING 49045 <br />TEST FREQUENCY ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER(Specify) 49046 49047 <br />❑ S. VISUAL PIPE MONITORING. <br />49048 <br />FREQUENCY ❑ a. DAILY ❑ b. WEEKLY ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED' <br />49049 <br />" Allowed for monitoring of unburied emergency enerator fuel piping only per HSC 25281.5 3 <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR §2636(a)(3)]. <br />490-50 <br />❑ 7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br />490-51 <br />❑ 99. OTHER (Specify) <br />49°-52 <br />490-53 <br />UPCF UST -D (12/2007) 1/4 <br />