My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
2300 - Underground Storage Tank Program
>
PR0231841
>
COMPLIANCE INFO 2011 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 1:58:23 PM
Creation date
7/12/2019 1:58:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2017
RECORD_ID
PR0231841
PE
2361
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
01
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In addition to the submersible pump problems encountered without an in-line check valve, <br />the metering .portion of. the leak detector`_is: hammered by hydraulic shock. This results in <br />a ? many leaks going undetected. Those Peak deter Cee are dust not "equiped' for the. job you <br />purchased them for. 77 <br />The 99 LD -2000 is -the answer-Ynu haYe been joQl ng_1?or YMI leatc, detectors, with an inte- <br />grated check valve_an.d_ltre�s r re_�e MIeeLNwq save;mone ar�dTeduce-customerfrustra- <br />tion at the dispenser and: reduce- service -cabs_ <br />The 99 LD -2000 <br />Has A-Higherlevef OfP'erforiiianc+e-OverA-broader Range of Burial Depth, Line Length, <br />And Piping System_TypesTharrAnV-.thefwLeak Detector.:- .. <br />Additional Features <br />• Over 20% increased flow capacity :_ <br />• Guaranteed'for 24 ninths from_date;of installation to detect 3 GPH @10 PSI leak <br />• One Way Poppet-fizi <br />• Reverse Ratio' Piston /Poppet comGinaiori <br />• Smaller Volume FasterReSpense piston sire <br />• Shortest profile leak detector -available -6r. -'tight" installations <br />• Atl.:fuels-( gasoline dieselalcoho.luj---- <br />! • All-pipetibes4fle) b.le_--fiber."glass steel -qj, -E esiliency <br />• Exceeds EPA regulations (3 GPH 10 PSI)"7 <br />- <br />• .Detects leaks up to -1Ot', above the leak detector _ <br />• Installs with 2 1 /1&"'six point socket°or pipe wrench-- <br />Increased <br />renchIncreased Flow Capacity,.. _.,...... -.-.,.._.....:...... .. - <br />- The 99 LD -2000 has maximized the flow and flow path in existing, older submersible pump <br />heads'. This new. design allows over 20% momflow than previous LD -2000 models, maximiz- <br />ing -pump performance for earlier -.pump heads:` `- <br />Longest Guarantee,— <br />*.-Ihe Q91D-2000 shares the:longest,gtiarantee available in the industry, alflng with all other. <br />VMI 99 LD -2000 series {eakrletectors:�for 24-m6nths-from date of -installation, the LD -2000 is <br />guaranteed to see a-3-Gf I+4eaK-C: 0_'PS1•---: <br />-Way.Poppet----PI,6 w PAth -�: <br />• The One Way PoppetF[ow Pati �`solates.pump urC3iilence from line leak detection at pump <br />o oes notrl ctian bse-af—_�.__.. <br />thermal conditions_.encountered.d p (p ' ' g c-hange is <br />- .station � er�at�on, rec�saon -mete-�a.d � - <br />insignificant down -to -:209 - j <br />""Patent pending _.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.