My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
2300 - Underground Storage Tank Program
>
PR0231841
>
COMPLIANCE INFO 2011 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 1:58:23 PM
Creation date
7/12/2019 1:58:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2017
RECORD_ID
PR0231841
PE
2361
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
01
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br />been addressed for CHEROKEE LANE SERVICE STATION` as of January 29, 2016. <br />Open violations from October 12, 2015 inspection <br />Violation #103 - Current financial responsibility documents not submitted. <br />Financial responsibility documents have not been submitted to the EHD. The Letter of Chief Financial Officer that wa <br />uploaded into the California Environmental Reporting System (CERS) on 7-14-14 has a date of 7-14-14. A current <br />Letter of Chief Financial Officer has not yet been uploaded into CERS. Current financial responsibility documents an <br />required to be submitted annually. Immediately log into the California Environmental Reporting System (CERS) at <br />http://cers.calepa.ca.gov/, and upload the required document(s). <br />Violation #104 - UST Operating Permit Application for Facility and Tank information not submitted or <br />current. <br />The UST Tank Information for the87A, 87B, 91, and diesel USTs are not current in CERS. The secondary <br />containment for the vent and vapor recovery piping should be marked none for each of these tank systems. The <br />primary containment of the vapor recovery piping should be marked none for the diesel tank system. Any change of <br />information must be updated in CERS within 30 days of the changes. Immediately log into CERS, update the requirE <br />information, and submit for review by the EHD. <br />Violation #106 - Monitoring and response plans not current or approved by the EHD. <br />The monitoring plan is not current. The 87A 12,000 gallon UST system and the diesel 10,000 gallon UST system <br />should each list VMI as the mechanical line leak detector manufacturer and LD 99-2000 as the model. The monitorin <br />plan must be uploaded to the California Environmental Reporting System (CERS). Immediately log into CERS, mak( <br />the necessary changes, and submit for review by the EHD. <br />Violation #107 - Plot plan/site map not submitted or failed to completely show where monitoring is <br />performed. <br />An accurate UST Monitoring Site Plan was not submitted. The site plan uploaded into CERS on 7-14-14 does not list <br />the mechanical line leak detectors, the float and chain leak detection mechanism within the under dispenser <br />containment sumps, nor the Incon monitoring panel. A site plan must be submitted identifying the locations where <br />monitoring will be performed. Immediately log into the California Environmental Reporting System (CERS) at <br />http://cers.calepa.ca.gov/ and upload a copy of the UST Monitoring Site Plan. <br />Violation #113 - Failed to submit monitoring system certification test report within 30 days. <br />Annual monitoring system certification, leak detector testing, and spill container testing was performed on 10-28-14 <br />and a test report was submitted on 1-29-15, more than 30 days after the date of testing. A copy of the test report <br />must be submitted within 30 days of the tests. Take all necessary precautions to ensure testing and submittal of test <br />reports are performed in a timely manner. <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.