Laserfiche WebLink
E L <br />SWRCB, January 2002 13 F..FG k 'q <br />5. SECONDARY PIPE TESTING ^„r It „ <br />Test Method Developed By: X Piping Manufacturer Industry Standard Professionn'Hn�in ei't� I� <br />-! Other (Spec) <br />II Test Method Used: X Pressure -' Vacuum 'Hy r �' V IVIL 114 <br />Other (Spec) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment RCSOIutIOn: I W -I; Psi <br />Piping Run #1 <br />Piping Run #2 <br />Piping Run #3 <br />Piping Run #4 <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 180' <br />Approx. 200' <br />Approx. 190' <br />Approx. 70' <br />Product Stored: <br />Regular 87 <br />Super 91 <br />Regular 87 <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at STP <br />Piping Sump #1 <br />Test boot at STP <br />Piping Sump #2 <br />Test boot at STP <br />Piping Sump #3 <br />Test boot at STP <br />Piping Sump #4 <br />Wait time between applying <br />ressure and starting test: <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />Test Start Time: <br />9:00 <br />9:10 <br />9:20 <br />9:30 <br />Initial Reading (Ri): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time: <br />10:00 <br />10:10 <br />10:20 <br />10:30 <br />Final Reading (RF): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test Duration: <br />I Hour <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -R,): <br />0 Psi <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />Test Result: <br />Pass <br />Pass <br />Pass <br />Pass <br />Comments— (include information on repairs made prior to testing, and recommendedfollow-upforfailed tests) <br />