My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1994 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
2300 - Underground Storage Tank Program
>
PR0231841
>
COMPLIANCE INFO 1994 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2019 5:29:19 PM
Creation date
7/12/2019 2:17:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994 - 2010
RECORD_ID
PR0231841
PE
2361
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
01
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />SAIF dOAQUIN COUNTY <br />EwiRoNMENTAL HEALTH DEPAR2 dT <br />600 East Alain Street, Stockton, CA 95202-3029 <br />Telephones`(209)468--3420F&v (209)468:3433`Web www:sjgov:oie/ehd <br />ACTIVE FACILITY <br />$500 FEE INCLUDES FACILITY FEE + 1 TANK (2002-2007) 2003 2004 2005 2006 12107 2008 <br />$550 FEE INCLUDES FACILITY FEE + 1 TANK (2006) <br />$125 PER TANK AFTER FIRST TANK <br />TANK PENALTY ASSESSED $ <br />TANK SURCHARGE =$15/TANK <br />STATE SURCHARGE FOR FACILITIES NOT ALREADY ON INVENTORY IN A CUPA PROGRAM =$24.00/ FACILITY <br />PERMANENT CLOSURE <br />Removal or Permitted Closure in Place <br />TANK ID # s CLOSURE FEE _ $315 / TANKT# TANKS X $315 = <br />_ TEMPORARY CLOSURE <br />Plan Review and Ins ections <br />TANK ID # (s) : 7TEMPORARY CLOSURE FEE = $315 / FACILITY $ <br />INSTALLATION PLAN CHECK <br />Plan Check and Construction Inspections) <br />TANK ID # (s) : PLAN CHECK FEE _ $840 / FACILITY <br />REPAIR PLAN CHECK <br />TANK ID # (s) : <br />TANK RETROFIT REPAIR FEE = $315 / FACILITY (use for monitoring equipment, cold startslF uoorades. y <br />spill buckets, sumps, miss.) ` <br />PIPING REPAIR FEE = $315 / FACILITY (use for piping, under -dispenser containment, ect.) <br />OFFICE USE ONLY <br />
The URL can be used to link to this page
Your browser does not support the video tag.