Laserfiche WebLink
D. Results of Testing/Servicing <br />Software Version Installed: <br />mplete the <br />following cnecKust: <br />Is the audible alarm operational? _ - <br />® Yes <br />❑ No' <br />® Yes <br />❑ No' <br />Is the visual alarm operational? _ <br />® Yes <br />❑ No' <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />® Yes <br />❑ No. <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br />operation? <br />❑ Yes <br />❑ No' <br />If alarms are relayed to a remote monitoring station, is all ommunications equipment (e.g., modem) operational? <br />® N/A <br />® Yes <br />❑ No' <br />For pressurized piping systems, does the turbine automa ically shut down if the piping secondary containment monitoring system detects a leak, <br />❑ N/A <br />fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check all that apply) 0 Sump/Trench <br />Sensors; 0 Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? ® Yes; ❑ No. <br />El Yes <br />El No <br />For tank systems that utilize the monitoring system as t e primary tank overfill warning device (i.e., no mechanical overfill prevention valve is <br />® N/A <br />installed), is the overfill warning alarm visible and audibl at the tank fill point(s) and operating properly? If so, at what percent of tank capacity <br />does the alarm trigger? 0% <br />❑ Yes <br />® No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name <br />and model for all replacement parts in Section E, below. <br />[-]Yes* <br />® No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check al/ that apply) <br />❑ Product; ❑ Water. If yes, describe causes in Section E, below. <br />® Yes <br />❑ No' <br />Was monitoring system set-up reviewed to ensure properl settings? Attach set up reports, if applicable <br />® Yes <br />❑ No' <br />Is all monitoring equipment operational per manufacturer' specifications? <br />• In Section E below, describe how and when these deficiencies were or will bia corrected. <br />HAD TO SWITCH WIRES IN VEEDER ROO BECAUSE 91 AND 87 WERE BACkWARDS AND 87 <br />Comments: AND DEISEL . NOW ALL 4 TURBINE SUMPS HAVE SHUT DOWN. <br />Monitoring System Certification Page 2 �f4 2)21/07 <br />Y 4 <br />