Laserfiche WebLink
SWRCB, January 2002 <br />J. SECONDARY PIPE TESTING <br />I est metnoa Ueveloped By: ..."'Piping Manufacturer <br />Other (Spec) <br />Test Method Used: -.A <br />YXressure <br />I Other (Specify) <br />Page of <br />(7, Industry Standard C Professional Engineer <br />I <br />L Vacuum <br />Hydrostatic <br />Test Equipment Used: yys� IA V. -o /r 04.,,0,d, <br />j I . " " <br />, aYk, j <br />Equipment Resolution: <br />Piping Run# <br />Piping Run # <br />Piping Run <br />Piping Material: <br />Piping Manufacturer: <br />Piping Diameter: <br />Length of Piping Run::> <br />Product Stored: <br />?- F <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />0 ressureoacuum/water and <br />starting"test: <br />Test Start Time: <br />4 <br />r <br />Initial Reading (111): <br />Test End Time: <br />v - <br />Final Reading (110: <br />Test Duration: <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or <br />Criteria: <br />Gest Result:_jpass <br />[j Fail F ai <br />0 Pass 0 Fail <br />IJ Pass 11 F ail <br />11 Pass 0 Fall <br />Comments — (include information on repairs made Prior <br />to testing, and recommended follow -upforfailed tests) <br />