My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1994 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
2300 - Underground Storage Tank Program
>
PR0231841
>
COMPLIANCE INFO 1994 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2019 5:29:19 PM
Creation date
7/12/2019 2:17:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994 - 2010
RECORD_ID
PR0231841
PE
2361
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
01
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />J. SECONDARY PIPE TESTING <br />I est metnoa Ueveloped By: ..."'Piping Manufacturer <br />Other (Spec) <br />Test Method Used: -.A <br />YXressure <br />I Other (Specify) <br />Page of <br />(7, Industry Standard C Professional Engineer <br />I <br />L Vacuum <br />Hydrostatic <br />Test Equipment Used: yys� IA V. -o /r 04.,,0,d, <br />j I . " " <br />, aYk, j <br />Equipment Resolution: <br />Piping Run# <br />Piping Run # <br />Piping Run <br />Piping Material: <br />Piping Manufacturer: <br />Piping Diameter: <br />Length of Piping Run::> <br />Product Stored: <br />?- F <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />0 ressureoacuum/water and <br />starting"test: <br />Test Start Time: <br />4 <br />r <br />Initial Reading (111): <br />Test End Time: <br />v - <br />Final Reading (110: <br />Test Duration: <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or <br />Criteria: <br />Gest Result:_jpass <br />[j Fail F ai <br />0 Pass 0 Fail <br />IJ Pass 11 F ail <br />11 Pass 0 Fall <br />Comments — (include information on repairs made Prior <br />to testing, and recommended follow -upforfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.