Laserfiche WebLink
Monitcring System Certification <br />' Site Address: _ Date ol" festing/Servicing: <br />F. In -Tank Gauging /SIR Equipment: ❑ C,Iieck this box if tank gauging is used only for inventory control. <br />/❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes <br />❑ <br />No* <br />Has all input. wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ <br />No* <br />Was.accuracy of system product level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ <br />No <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the followinff checklist: <br />,O'Yes <br />Cl <br />No*LForuipment <br />start-up or annual equipme�tfertification, was a leak simulated to verify LLD performance? <br />❑ <br />N/Ak <br />all that apply) Simulated leak rate: �] 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />Yes <br />❑ <br />No* <br />ll LLDs confirmed operational and accurate within regulatory requirements? <br />Pi>Ts <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />yl Yes <br />❑ <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />N/A <br />❑ Yes <br />❑ <br />b* <br />For electronic LLDs, does the turbine automatically shut-off if the LLD detects a leak? ° <br />N/A <br />❑ Yes <br />❑ o* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />yj N'A u' uiscunnecteuf <br />❑ Yes ❑�lo* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />N/A malfunctions or fails a test? <br />❑ Yes ❑`,No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br />,DC7 N/A <br />,ZYcs ^ No Were all items on the equipment manufacturer's maintenance rheCl{lict Completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />