Laserfiche WebLink
ELITE IV CONTRACTORS INC. <br />2535 Wigwam Dr., Stockton, CA 95205 <br />Fed ID # 68-0286169 <br />August 26, 2003 <br />Cherokee Lane Service Station <br />900 Cherokee Lane <br />Lodi, CA 95215 <br />Re: 989 Fix <br />Dear Mr. Randhaina: <br />Phone: (209) 461-6337 <br />Fax....: (209) 461-6342 <br />eliteiv@sbcglobal.net <br />We were pleased to do your AB989 rcpa:f on your 3" secondary lines. There was <br />a misunderstanding about your AB989 paperwork, so as to the saw cutting and <br />permits, there will be no charge to you. We also found a technical erroi in the <br />l --.')or calculation which allows for the difference in the total amount below. <br />We had to install a split 3"X2" boot in your #3 tank on the product line to be able <br />LO test your secondary piping. We tested all secondary piping and found leaks, <br />not underground, but under your dispensers. This was found when we put a <br />helium test on lines. The 4" nut on your Bravo 3" product penetration fitting was <br />broken. In order to test, it had to be replaced. This involved turning off product <br />to that penetration, removing impact valve from 1 ''/z" riser through that <br />penetration. Installed new 1 '/z"X3/4" o -ring and 4" penetration nut. Then <br />reinstalled impact valve and connected back to dispenser. We had to do this same <br />procedure on the other two (2) product lines. <br />MA'T'ERIAL <br />1 — 3"X2" split boot w/install kit $ 388.00 <br />3 — 4" Bravo penetration nuts 117.00 <br />3 —11/2"X3"X3/4" Bravo penetration 0 -rings 72.00 <br />Helium Gas & tester 175.00 <br />Sub total $752.00 <br />Tax 58.28 <br />LABOR <br />To install 3"X2" boots (3hrsX$50) 150.00 <br />Additional Labor (9hrsX$ 1 00=$900 X 2) 1,800.00 <br />Sub total $2,760.28 <br />20% Markup 552.06 <br />Total $3,312.34 <br />Down Pymt. =1,000.00 <br />Amount Due$2,312.34 <br />