Laserfiche WebLink
SWRCB, January 2002 <br />SECONDARY PIPE TESTING <br />Page of <br />Test Method Developed By: 11 Piping Manufacturer 'dustry Standard Professional Engineer <br />110 <br />,ther (Specify) <br />Test Method Used: 8"Pressure D Vacuum 11 Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />, m -OM.- <br />Piping Run r? <br />Piping Run # <br />Piping Run # <br />Piping Run # <br />Piping Material: <br />Piping Manufacturer: <br />&?W La <br />Piping Diameter: <br />3 <br />Length of Piping Run: <br />S <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />/0 <br />Test Start Time: <br />C)50 C <br />Initial Reading (R4): <br />Z- <br />PS <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -P.4): <br />Pass/Fail Threshold or <br />Criteria: <br />W Fail <br />0 <br />E�,as &, 0 Fait. <br />-a D., Faff <br />.:P <br />0:ftfl: <br />Comments — (include information on repairs made prior to testing, and recommended follow±pfor jailed tests) <br />