Laserfiche WebLink
S'IA RCB, January 2002 Page of <br />6. UNDER -DISPENSER CONTAIN?viFNT (ITnC1 TF..Cfrnvr_ <br />Test Method Developed By: ❑ UDC'Manufacturer ❑ Industry Standard v u 7 --'Professional Engineer <br />f <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />,'.� } r, lt"fl! ' `fdc jY -. k!"'rxu d!F. • r }n ���n iifr' {. .i. F:teaftp. r.. .:-. <br />ry <br />r. n .'• .rt f�'ffiw� w��Rl.LW .. t....y, <br />UDC # <br />UDC # <br />UDC # UDC # <br />UDC Manufacturer: <br />UDC Material: <br />UDC Depth: <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testing: <br />Portion of UDC Tested <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />C Yes ❑ No [INA <br />❑Yes ❑ No ❑ NA <br />Q Yes ❑ No ❑ NA <br />❑ Yes u No u NA <br />product and water)?' <br />Turbine shutdown response time <br />Is system programmed for fail- <br />safe shutdown?" <br />❑ yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />❑ yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes G No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />Test Start Time: <br />Initial Reading ): <br />Test End Time: <br />Final Reading F): <br />Test Duration: <br />Change in Reading (RF- <br />P4)-Pass/Fail Threshold or Criteria: <br />Tist;Resu)li{: <br />Q:;Eass, . 0 gam` <br />:.Pas .:.'.C� F ii., <br />t7? Pass'; Q Paih <br />'0 Pass: ❑ Rsii . <br />Was sensor removed, for testing? <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No Q NA <br />Q Yes ❑ No ❑ NA <br />C! Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />verified functional after testing? <br />, <br />a <br />Comments — (mclude information on repairs made prior to testing, and recommended follow-up for failed tests) <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to as of the questions indicated with an <br />asterisk (*) is "NO" or "NA', the entire UDC must be tested. (See SWRCB LG -160) <br />