Laserfiche WebLink
Monitoring System Certification <br />Site Address: UST Monitoring Site Plan <br />............. .................I................. <br />. <br />. n.^M11A.f:Sc. <br />!� . <br />. . <br />. . . <br />Z. c .................................. <br />. . . <br />. . . . . . . . . <br />. . . . . <br />l; <br />. . . <br />.. - ........... <br />z3 <br />3 <br />; <br />CA <br />.....r...................I.............. <br />_ : <br />s <br />.............. ................___ <br />... <br />- <br />............... I... <br />...... <br />......... .. <br />.0 <br />....................................LAIA- <br />... <br />..................................................... <br />........................................... <br />I......... <br />....................................... <br />..................................................... <br />..................................................... <br />............... I ..... <br />.................................. <br />............................. <br />..................... <br />�0� ....... <br />.............. <br />I .... <br />I ......... <br />............. <br />............. <br />.......................................... <br />................................................ <br />.................. <br />. . . . . . . . . . . . . . . . . . <br />... ... ...... ... <br />.. <br />..................... <br />....................................... <br />......... <br />. . <br />? .........D1. <br />........ <br />............ <br />2 . <br />.. . <br />... <br />.. <br />.... <br />......... <br />.......... <br />. <br />... <br />t'+ua�T.11 <br />.... <br />. <br />... <br />. . <br />... <br />... <br />Date map was drawn: /j/jQ1— <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br />Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br />locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br />spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br />detectors; and in -tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br />was prepared. <br />Page of 85W <br />