My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1994 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
2300 - Underground Storage Tank Program
>
PR0231841
>
COMPLIANCE INFO 1994 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2019 5:29:19 PM
Creation date
7/12/2019 2:17:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994 - 2010
RECORD_ID
PR0231841
PE
2361
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
01
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring <br />program are conditions of the operating permit. The permit holder must notify San Joaquin County <br />Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br />procedures, unless required to obtain approval before making the change. <br />Required by Sections 2632(d) and 2641(h) CCR. <br />n I C-1 <br />Facility Name <br />Facility Address <br />A. Describe the frequency of performing the monitoring: <br />Tank (® M 1 00 Q -Cal ►- L <br />Pipi <br />B. What methods and equipment, identified by name and model, will be used for <br />performing the monitoring: <br />Tank C", ti k h n F= Nl Cl <br />Pipi <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan <br />should be attached): <br />D. List the name(s) and title(s) of the people responsible for performing the monitonng <br />and/or maintaining the equipment: <br />E. Reporting format for monitoring: <br />Tank <br />Piping <br />F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br />Maintenance must be in accordance with the manufacturers' maintenance schedule <br />but not less than every 12 months: �7 n <br />G. Describe the training necessary for the operation of UST system, including piping, <br />and the monitoring (equipment: <br />E is14i <br />
The URL can be used to link to this page
Your browser does not support the video tag.