Laserfiche WebLink
TABLE OF CONTENTS <br />' 1 0 INTRODUCTION 1 <br /> 1 1 SITE DESCRIPTION 1 <br /> 12 BACKGROUND 1 <br />' 13 INITIAL CONTAMINATION ASSESSMENT 2 <br /> 20 PROJECT ORGANIZATIONAL STRUCTURE 2 <br /> 21 PROJECT MANAGER RESPONSIBILITIES 2 <br />' 22 SITE SAFETY OFFICER RESPONSIBILITIES 2 <br /> 23 SAMPLING TEAM PERSONNEL RESPONSIBILITIES 3 <br /> 3 0 JOB HAZARD ANALYSIS 3 <br /> 31 CHEMICAL HAZARD 3 <br /> 3 1 1 Skin Puncture 4 <br />' 3 12 Ingestion 4 <br /> 3 13 Eye and Skin Absorption 4 <br /> 3 14 Inhalation 4 <br />' <br /> 32 MECHANICAL HAZARDS 4 <br /> 3 3 ELECTRICAL HAZARDS 5 <br /> 34 HEAT STRESS 5 <br /> 3 5 COLD EXPOSURE 5 <br /> 3 6 EXPLOSIVE ATMOSPHERES 5 <br /> 40 PERSONNEL TRAINING 6 <br />' 50 PERSONAL PROTECTIVE EQUIPMENT (PPE) 6 <br /> 60 MEDICAL SURVEILLANCE 6 <br /> 70 AIR MONITORING PROGRAM 6 <br /> 80 SITE CONTROL PLAN 7 <br /> 90 DECONTAMINATION PLAN 7 <br /> 91 EMERGENCY DECONTAMINATION 7 <br /> 100 EMERGENCY NOTIFICATIONS 7 <br /> 110 EMERGENCY RESPONSE PLAN 8 <br />' 120 EMERGENCY ACTION PLAN 8 <br /> 366-002 <br />