My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007836
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
640
>
2900 - Site Mitigation Program
>
PR0529779
>
ARCHIVED REPORTS XR0007836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:00:51 AM
Creation date
7/17/2019 9:28:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007836
RECORD_ID
PR0529779
PE
2960
FACILITY_ID
FA0019644
FACILITY_NAME
FORMER GENE GABBARD INC
STREET_NUMBER
640
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906004
CURRENT_STATUS
01
SITE_LOCATION
640 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK REQUEST FORM <br /> Date of Request: 12/07/04 Requested Completion Date. 12/08/04 <br /> Proj Name. Gabbard Proj No: 256 <br /> Site Address: 640 N. El Dorado Stockton CA -'ask: none <br /> t <br /> Project Manager. John Lane Field Personnel: Scoma <br /> j Client Contact: Gary Gabbard Phone No: <br /> � - J <br /> Regulatory Contact: Lori Duncan Phone No 468-0337 <br /> Approval: Completion Date: /;-lo r f a I <br /> READ AND UNDERSTAND PRIOR TO LEAVING FOR SITE <br /> I Notify Lori Duncan 48 hours prior to arriving on site to approve sampling schedule Done JPL <br /> 2 Bring all equipment to purge and sample seven site wells (MWI-MW7) I expect you will <br /> need bailers, pump, meters, interface probe, w/I probe All wells are 2" diameter Wells <br /> MWI-MW4 are about 32 feet deep, wells MW5-MW7 are about 36-37 feet deep Water <br /> level at about 26-27 feet <br />• 3 Upon arrival to the site, remove skimmer in well MW3 and bail product if present Then <br /> monitor DTW using interface probe prior to measuring DTW in any other well <br /> 4 Remove well caps in all wells, then monitor depth to water in all site wells The order is <br /> MW5, MW4, MW2, MWI, MW6, MW7, MW3 MW3 is hot and has free product (and <br /> skimmer) Use interface probe on well MW3 and compare to initial reading in that well If <br /> readings are not equal, monitor every 15 minutes until the DTW stabilizes <br /> 5 Purge and sample wells in order Order is MW5, MW4, MW2, MWI, MW6, MW7, MW3 <br /> MW3 is hot and has periodically had free product since June 2001 MWs 1, 2, 4, 5 are mildly <br /> impacted with PCE MWs 6 and 7 are moderately impacted with PCE Sample all wells <br /> within 2 hours after finishing the purge <br /> 6 Collect a sample from well MW3 after removing floating product and purging 3 casing <br /> volumes (including product/water mixture) After removing floating product, be sure to <br /> purge remaining volume from the upper screened interval Collect sample only after you <br /> confirm that there is no floating product in the well bore <br /> 7 Send samples to Argon for EPA 8260 full scan plus oxygenates + EDB, 1,2-DCA Note on <br /> chain of custody that EDF is required <br /> 8 Contain water in properly labeled drums <br /> 9 Take drum count and consolidate all drums in convenient location <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.