Laserfiche WebLink
19 April 2000 <br /> AGE-NC Project No. 98-0426 <br /> Page 2 of 2 <br /> Sol] samples will be collected from each boring at five-foot inter,als beginning at 5 feet bsg in <br /> boring "B" and beginning at a depth of 15 feet bsg in boring "A". Following installation, the wells <br /> will be developed and the casing elevations surveyed. The wells will be added to the existing ground <br /> water monitoring well sampling program. <br /> Detailed field procedures for the installation and sampling of the monitoring wells were given in the <br /> Monitoring ff'ell Installation lf,ork Plan, dated 29 July 1999 and prepared by AGE. The monitoring <br /> well constructions are illustrated in Ficyures 3 and 4. <br /> If you have any questions or comments, please contact our office at (209) 467-1006. <br /> Sincerely, <br /> Adi,rnrced GeoEnvironrnental, Inc. <br /> Kevin 'McKibben <br /> Project Geologist <br /> cc: Mr. Charles Skobrak - Charlie's Day & Nite <br /> Adrairced CeoEn%ironmental,Inc. <br />