Laserfiche WebLink
FIGURE _ <br /> _ . EXCAVATION <br /> AND SOIL SAMPLING PLAN <br /> PROJECT: CHEVRON\SQ. EL DORADO <br /> LOCATION: 1374 SO. ELDORADO <br /> I JOB NO.: 203-175-3289 <br /> _ ND <br /> ~ 'I WASTE OIL TANK • SALPID <br /> LOCATION SAMMPPLEE L LOCATION <br /> _ A PROPOSED WELL <br /> I SOIL I •� EXPECTLOCATION <br /> ED <br /> (ND) EXCAVATION <br /> • • 0 FEET 25 <br /> STOCKPILE \IUD L- -'I� W[°2317 LND) <br /> (ND) \ 11,17/89 MY <br /> I AREA I CNp7 - WO-2- <br /> I • P I -• I S � s <br /> ONWTELGRUDTER— W- 0 • <br /> FLOW DIRECTION T;I W <br /> • C3404• w <br /> ►— <br /> (I4D), • • cn <br /> _ _ _ _ y • • O <br /> (.NDS <br /> L>\ID) (ND) • • s O <br /> 15UWp I t <br /> O <br /> •�• 2 LOCATIONS 4 • • I <br /> AREA OF LNal� UI f NDl --____ w <br /> EXPECTED EXCAVATION. <br /> WILL BE EXCAVATED O <br /> AND SAMPLED N <br /> AS REQUIRED <br /> BY FIELD EVIDENCE <br /> tND) <br /> CHARTER WAY <br /> O—O ull�eyl a�scoNjcsrte -aAU pieve, �rc��t���C!19 Feb) <br /> t = TPH ��ev� cd�iovt �n m�/Kg <br /> Nle = Na,l a � WO-1 -too-q) TP-1) SW-1-30-3 C Mar eXCax)A 10v0 <br /> CHEVRON USA NQ+e ; Ljp San, a Vo I, 10 dow vaAe ; 51rJ Sam 1e� ap�STOCKTON CALIFORNIA TP1 a,b� 1 - sam l 9 terklmaiel 1 be{ou <br />