Laserfiche WebLink
'i <br /> 'r <br /> 't <br /> !i <br /> D. ON-SITE WORK PLANS: <br /> - Project Objectives: ' Excavation of contaminated <br /> i — <br /> t - <br /> soils to the appropriate limit. It is anticipated <br /> �E <br /> -that approx. 1960 cubic yard of soil will be <br /> •1 <br /> - -- -_., <br /> removed. <br /> - Work tasks (with proposed timetables) : G <br /> s <br /> Task l:_Excavation/trenching <br /> _-November 1989 <br /> ! Task 2 : Soil sampling <br /> r <br /> •h <br /> i <br /> -November 1989 <br /> r <br /> Task 3 : <br /> Task 4 • <br /> it <br /> s <br /> i <br /> a <br /> f <br /> E <br /> i <br /> s <br /> f� <br /> j <br /> i <br /> J <br /> F s <br /> i <br /> r <br /> I. <br />