Laserfiche WebLink
-'� - <br /> CHEVRON WELL NIOh11TORINIG DATA SHEET <br /> Project#: 1 Station#: 9 <br /> Sampler: �/ Date: c16 <br /> Well X D : M Lj .c j Well Diameter: 3 4 6 S <br /> Total Well Depth: Depth to Water: 3-9. 2- <br /> Depth <br /> 9. ZDepth to Free Product: Thickness of Free Product (feet). <br /> Referenced to: cpIe Grde DO Meter (if req'd): Ysr HACH <br /> 2- <br /> 016 5' 102 <br /> 3- <br /> 037 6" 147 <br /> 4- 065 ahcr r261131°•0163 <br /> PLroe Melhod Bader Sampling- Method Bailer <br /> Dspocable Baaler�--- Diq�3sable Bailer <br /> 'kilddleburg Extraction Port <br /> Electnc Subrners)ble Other. <br /> Eanaction Pump <br /> (DINT <br /> q,D � Gals <br /> 1 Case Vol unic(Gals) 5per.Ified Volumes Calculated Volumic <br /> Tine Temp (IF) pH Cond Gzls Removed Obsen ations <br /> Z- '1, Ilod <br /> 11C <br /> Did well dewater? Yes Gallons actually evacuated: ) Z <br /> Sampling Time, Sampling Date: 1 (- Z( <br /> Sample 1 D : 1J1�c� Laboratory: Sequoia L N Creek Assoc Labs <br />{D Analyzed for: H G MTBE TPH-D Other <br /> Duplicate T D Analyzed for TPI-[ G BTEX MTBI TPH D Other <br /> D Q (1f m.q`d) Pre-purge "gl Post-purge 1 <br /> O R P. (if req d)' <br /> Pre-Purge mV Post-purge mV <br />