My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012682
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1448
>
3500 - Local Oversight Program
>
PR0544673
>
ARCHIVED REPORTS XR0012682
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:31:42 AM
Creation date
7/18/2019 3:19:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012682
RECORD_ID
PR0544673
PE
3528
FACILITY_ID
FA0006182
FACILITY_NAME
REGAL STATION #604
STREET_NUMBER
1448
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
1448 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
550
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br /> tri <br /> Wastemizer Corporati®n <br /> 55 Southern Boulevard. Nesconset. New York 11767Vf5161979-8338 <br /> i <br /> CYCLO-PURGE BENEFITS <br /> A list of benefits achieved by using the Cyclo-Purge System for <br /> venting the vadose formation, stripping floating VOC product aild <br /> regenerating GAC canisters is presented here for reference. <br /> • 90% cost savings compared to traditional sail venting using GAC <br /> canisters. <br /> 1 <br /> • No atmospheric emissions, which avoids the requirement for <br /> monitoring and reporting to the regulatory agencies. <br /> 6 <br /> Total onsite remediation and regeneration avoids the requirement ; <br /> ` for the monitoring and reporting to the regulatory agencies. t i <br /> j Low initial capital investment requirement. One Cyclo-Purge can be i <br /> .1 <br /> used for recovery of highly concentrated vapors at the initial, high <br /> rate remediation. It works equally as well for very dilute VOC <br /> concentrations as the soil is depleted of the VOC"s at the end of <br /> remediation. } <br /> k <br /> m Immediate interruption of the downward migration of contaminants ; <br /> In the vados formation, thereby preventing further contamination of <br /> groundwater immediately, not at the end of the project. <br /> • Process performance is easily confirmed by viewing the recovered <br /> product in real time during the operation. <br /> All equipment is easily transported between sites for maximum <br /> E <br /> - benefits from the capital investment. Subsequent projects are <br /> - ---- - <br /> - —,— ed-for-only the-cost-of-well-emplacement- ---- <br /> A I <br /> i <br /> '4 s <br /> I <br /> j` <br />
The URL can be used to link to this page
Your browser does not support the video tag.